This is the list of works done by P C Mohan, MP of Bangalore Central, using the Member of ParliamentLocal Area Development Scheme (MPLADS) fund, in last five years.
Bangalore Central MP, P C Mohan has spent a little over Rs. 19 crores of his MPLAD funds during the 15th Lok Sabha, according to MPLAD data available with the Bangalore Urban D. This figure however, doesn’t tally with the numbers given in the MPLADS website.
- Spending on ‘Civic Amenities’ tops the MPLAD spending list with a fund utilization of a little over Rs. 7 crores. This category includes construction of community centres, cultural centres, park improvements, hostel improvements, library improvements etc
- ‘Education’ is the next big spending category with fund utilisation of Rs. 6.7 crores. This includes construction of school buildings, class rooms, library facilities etc
- The MP has spent Rs. 3.35 crores on funding 67 water projects. This includes sinking borewells, providing pumpsets, pipelines, water tanks, water connections etc
- P C Mohan has also spent 1.16 crores on funding medical equipment to 2 hospitals
- The MP has also funded the construction of 17 toilet complexes totalling to a little over Rs. 1 crore.
- The MP has spent his money on a project in Nelloor, Andhra Pradesh, while actually the LAD fund should be spent within the constituency.
- Finally, the MP has spent Rs. 50 lakhs on a single road project
- The total number of projects funded by the MP – 207
We encourage and invite our readers to check the list and see whether the work has actually been done, if yes, check the quality of work, cost to quality ratio etc. You can comment below the article with your inputs.
The data shows the work done from 2009-10 to 2013-14, and shows even the works under progress.
Disclaimer:
1) The data has been obtained from Bangalore Urban Deputy Commissioner’s office. It has been presented here in its original shape, format and spellings.
2) Citizen Matters is not responsible for the errors if any, as the data has been produced in its original form, with minimum corrections.
Physical & Financial Progress on Implementation of MPLADS works in Bangalore Central LS constituency |
|||||||
Year | Sl No | Name & Location of the work |
Estimate |
Stage of the work | Implementing Agency | Expense incurred | Balance if any |
1 | 2 | 3 | 4 | 5 | 6 | 7 | |
2013-14 | 1 | Childrens playing tools, chainlink fencing and other development works at Maruti Sevanagara, ward no.59, highstreet park | 3.03 | Estimated awaited | Nirmiti Kendra | 0.00 | 3.03 |
2013-14 | 2 | Construction of Anganavadi and Library, Banasawadi, ward No.27, near old govt school 50×52 feet | 25.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 25.00 |
2013-14 | 3 | Vyayama Shaale (GYM) construction, Satyanagara, Maruthi seva nagara, Ward No.59 | 5.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 5.00 |
2013-14 | 4 | 5 computers, 1 printer and UPS supply for Devanga sangha school, Shivajinagar MLA constituency, Sampangiramanagar, Ward No. 110 | 2.70 | Completed | M/s Emerge Technologies | 2.70 | 0.00 |
2013-14 | 5 | 8 Computers, 1 Printer and UPS supply for Jyothipura Govt School, Bidarahalli hobli, Manduru Grama panchayat, Bengaluru East taluk | 4.00 | Completed | M/s Emerge Technologies | 4.00 | 0.00 |
2013-14 | 6 | 6 Computers, 1 Printer and UPS Supply for Kittaganoor village Govt School, Bidarahalli hobli, Mandur Grama panchayath, Bengaluru east taluk | 3.13 | Completed | M/s Emerge Technologies | 3.13 | 0.00 |
2013-14 | 7 | 6 Computers, 1 Printer and UPS supply for Manduru Govt School, Bidarahalli Hoobli, Bengaluru east taluk | 3.13 | Completed | M/s Emerge Technologies | 3.13 | 0.00 |
2013-14 | 8 | 2 borewell digging, tank construction, pipelining, and motor pump implimentation in Shivanagara ward No.107, Rajaji nagara Constituency | 9.60 | under progress | EEPRED | 0.00 | 9.60 |
2013-14 | 9 | 2 borewell digging, tank construction, pipelining, and motor pump implimentation in chaluvadi palya, ward No.107, Chamarajapete Constituency | 9.60 | under progress | EEPRED | 0.00 | 9.60 |
2013-14 | 10 | Additional works to Construction of New Building ward No 108, Bhuvaneshwari Kannada Yuvakara Gudisalu Nivasigala Sangha 5th Block, Rajajinagara Bangalore-10 | 3.00 | Estimate awaited | Nirmiti Kendra | 0.00 | 3.00 |
2013-14 | 11 | Supplying for GYM materials in Makkala koota park, Chamaraja pete ward No. 140, Chamarajapete | 2.00 | Estimate awaited | Nirmiti Kendra | 0.00 | 2.00 |
2013-14 | 12 | Toilet construction in Makkala koota park, Chamarajapete ward No. 140 | 3.00 | Estimate awaited | Nirmiti Kendra | 0.00 | 3.00 |
2013-14 | 13 | Toilet construction at AZAD nagar park, Azad Nagar, Chamaraja pete ward no.140 | 2.50 | Estimate awaited | Nirmiti Kendra | 0.00 | 2.50 |
2013-14 | 14 | Toilet construction in Nanjaamba agrahara, Chamarajapete ward no.140 | 2.50 | Estimate awaited | Nirmiti Kendra | 0.00 | 2.50 |
2013-14 | 15 | Additional works to Construction of Toilets in Civil Court premises ward No.110, Sampangiramanagara city Civil Court Premises | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2013-14 | 16 | Road improvement, Sarvagyanan nagar, ward no 79, opp komar hotel, cox town | 50.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 50.00 |
2013-14 | 17 | Construction of Library and Auditorium at ward No.141 Azad Nagar Govt urdu Higher Primary School | 20.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 20.00 |
2013-14 | 18 | Improving foothpath along lake | 100.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 100.00 |
2013-14 | 19 | Supply of 5 Computers with 1 Printer and 1 UPS | 2.70 | Completed | M/s Emerge Technologies | 2.70 | 0.00 |
2013-14 | 20 | Free Student Hostel Building, Gandhi Nagara Ward No. 94 (Karnataka state madiwala sangha ®, Sirur park road, Sheshadripuram | 10.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 10.00 |
2013-14 | 21 | Construction of First floor of Knowledge centre building in the premises of Swarna Bharath Trust Building Campus-2 Venkatachalam Mandal, Sri Pothi sriramulu Nellore District Andra Pradesh | 10.00 | Completed | Nellur District Andra Pradesh | 10.00 | 0.00 |
2013-14 | 22 | Old toilet repair work and present toilet 1st floor construction in Ward no.110, Sampangiramanagar | 12.50 | Estimated awaited | Nirmiti Kendra | 0.00 | 12.50 |
2013-14 | 23 | Construction of New Building in Maruthi School Ward No.28, Kammanahalli | 25.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 25.00 |
2013-14 | 24 | Supply of Equepments for Mass Casualty care ward No.92, Shivajinagar Bowring & Lady Curzon Hospital near Shivaji nagar Bus stop | 100.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 100.00 |
2013-14 | 25 | Meeting hall and Library construction for Revenue Dept Employee sangha, district commissioner office, KG Road Bangalore | 20.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 20.00 |
2013-14 | 26 | Public toilet construction, solor light, water supply and benches for park and other repair works in chinnappa park, ward no. 99, Rajaji nagar | 10.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 10.00 |
2013-14 | 27 | Development of Park near Dhobi Ghat including children play equipment, light and watchman shed and toilet at ward No.107, Shivangara, Bangalore-10. | 10.00 | Estimated awaited | EEPRED | 0.00 | 10.00 |
2013-14 | 28 | Development of Dhobi Ghat including water tank and other accessories at ward No.107, Shivanagar Bangalore-10 | 15.00 | Estimated awaited | EEPRED | 0.00 | 15.00 |
2013-14 | 29 | Construction of Library block at ward No.141, Kasturibanagar Bangalore-18 | 12.50 | Estimated awaited | EEPRED | 0.00 | 12.50 |
2013-14 | 30 | Re-Trofitting of Essentual Life Line Building to Government Boys Model School at Chamarajpet ward No.140 Chamarajpet | 12.00 | Estimated awaited | EEPRED | 0.00 | 12.00 |
2013-14 | 31 | Vyayama Shaale (GYM) construction, Satyanagara, Maruthi seva nagara, Ward No.59 | 5.00 | Estimated awaited | EEPRED | 0.00 | 5.00 |
Total | 495.39 | 28.16 | 467.23 | ||||
2012-13 | 1 | Health complex and yoga hall building construction work, ward no. 85, Doddanekundi, C A plot no.8P(1), AECS layout kundalahalli, bangalore | 25.00 | Completed | EEPRED | 25.00 | 0.00 |
2012-13 | 2 | School rooms construction work, Siddaganga education trust, Shivanagara, Warn No.107 | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 3 | Drilling of borewell at Christian Crematorium at At Ward no: 141, Azad nagar, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 4 | Drilling of borewell and construction of water tank at J.J.Nagar, Ward No: 136 Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 5 | Drilling of borewell and construction of water tank at Padarayanapura Ward No: 135 Bangalroe | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 6 | Drilling of Bore Well and Construction of Water Tank , Chamarajanagapet, Nanjaba Agrahara | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 7 | Dismantalling and construction of class rooms chalavadipalya ward No: 138, govt composite high school Dr. T.C.M. Royan Road, Bangalore | 10.00 | Completed | EEPRED | 10.00 | 0.00 |
2012-13 | 8 | Mini water supply scheme at subash nagar 1st cross, ward No: 195, Gandhi nagar Assembly const. Bangalore [Stage-1] | 4.70 | Completed | EEPRED | 4.70 | 0.00 |
2012-13 | 9 | Mini water supply scheme at subash nagar 1st cross, ward No: 195, Gandhi nagar Assembly const. Bangalore [Stage-2] | 3.00 | Completed | EEPRED | 3.00 | 0.00 |
2012-13 | 10 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- 6th cross, K.P.Agrahara Magadi Road, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 11 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- 4th & 5th cross, K.P.Agrahara Magadi Road, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 12 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- 7th cross, K.P.Agrahara Magadi Road, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 13 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- 5th and 13th cross, Bhuvaneshwarinagar, Magadi Road, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 14 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- 15th cross, Bhuvaneshwarinagar, Magadi Road, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 15 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- 7th cross, A-block, K.P.Agrahara, Magadi Road, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 16 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- Govt. Kannada and English Primary School, K.P.Agrahara, Magadi Road, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 17 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- 6th cross, Near Ganesh Temple behind Gopalpura, Magadi Road, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 18 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- Gopalpura main road, D- cross, Behind Minarva mill, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 19 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- 2nd cross, New Binny layout, Nagara katte Temple road, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 20 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- 1st main, near Kalikamba temple, New Binny layout, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 21 | Sinking of Borewell, errection of cistern, providing pump motor with electrical facilities and pipe line works at- No: 415, 1st main, New Binny layout, Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 22 | Improvements to Gymashium building on TCM Royan road in Gandhinagar Assembly const. Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 23 | Sinking of borewell at ward No: 120, K.P.Agrahara Magadi road, Bangalore Providing Pumping Machinery for borewell at K.P.Agrahara Magadi road, in Gandhinagar Assembly const. Bangalore Providing pipeline for borewell at K.P.Agrahara Magadi road in Gandhinagar Assembly const. Bangalore |
5.00 | under progress | EEPRED | 0.00 | 5.00 |
2012-13 | 24 | Sinking of borewell at M.R.Lane, Cottonpet, Gandhinagar Assembly const. Bangalore Providing Pumping Machinery for borewell at M.R.Lane, Cottonpet, Gandhinagar Assembly const. Bangalore Providing pipeline for borewell at M.R.Lane, Cottonpet, Gandhinagar Assembly const. Bangalore |
5.00 | under progress | EEPRED | 0.00 | 5.00 |
2012-13 | 25 | Sinking of borewell at Nalbanwadi Cottonpet, Gandhinagar Assembly const. Bangalore Providing Pumping Machinery for borewell at Nalbanwadi , Cottonpet, Gandhinagar Assembly const. Bangalore Providing pipeline for borewell at Nalbanwadi , Cottonpet, Gandhinagar Assembly const. Bangalore |
5.00 | under progress | EEPRED | 0.00 | 5.00 |
2012-13 | 26 | Sinking of borewell at N.M.Lane, Cottonpet, Gandhinagar Assembly const. Bangalore Providing Pumping Machinery for borewell at N.M.Lane, Cottonpet, Gandhinagar Assembly const. Bangalore Providing pipeline for borewell at N.M.Lane, Cottonpet, Gandhinagar Assembly const. Bangalore |
5.00 | under progress | EEPRED | 0.00 | 5.00 |
2012-13 | 27 | Improvements to Toilets in Labourers Fellowship school No.22 in Gandinagar Assembly Constituency, Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 28 | Providing Cobble Stones at Play Area in Labourers Fellowship shool No.22 Risaldhar Street, Seshadreipuram, Bangalore in Gandinagar Assembly Constituency, Bangalore Stage-1 | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 29 | Providing Cobble Stones at Play Area in Labourers Fellowship shool No.22 Risaldhar Street, Seshadreipuram, Bangalore in Gandinagar Assembly Constituency, Bangalore Stage-2 | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 30 | Drilling of Borewell and erection of Cistern with electrification. At Lakshmana Puri, Behind Khodays factory. | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 31 | Erection of Submersible pump set with laying pipeline with taps At Lakshmana Puri, Behind Khodays factory. | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 32 | Drilling of Borewell and erection of Cistern with electrification near Draupadamma Temple, V.R. Naidu Nagar, (Swatanthrapalya) Gandhinagar, Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 33 | Erection of Submersible pump set with laying pipeline with taps near Draupadamma Temple, V.R. Naidu Nagar, (Swatanthrapalya) Gandhinagar, Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 34 | Drilling of Borewell and erection of Cistern with electrification. At 2nd Main, 2nd Cross, Near Lakshmana Rao Park, Okalipuram, Bangalore | 2.50 | under progress | EEPRED | 0.00 | 2.50 |
2012-13 | 35 | Erection of Submersible pump set with laying pipeline with taps At 2nd Main, 2nd Cross, Near Lakshmana Rao Park, Okalipuram, Bangalore. | 2.50 | under progress | EEPRED | 0.00 | 2.50 |
2012-13 | 36 | Drilling of Borewell and erection of Cistern with electrification. At Near Gandhi Statue, 1st Main, Ramachandrapuram, Bangalroe | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 37 | Erection of Submersible pump set with laying pipeline with taps At Near Gandhi Statue, 1st Main, Ramachandrapuram, Bangalroe | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 38 | New building construction for ward no 108, bhuvaneshwari kannada yuvakara gudisala nivasigali sangha, block no 5, rajajinagar bengalooru. Slum assocation building | 11.00 | Completed | EEPRED | 11.00 | 0.00 |
2012-13 | 39 | Drilling Borewell and erection of cistern with electrification at 1st Main Kalappa Block Okalipuram Selvanagar Ramachandrapuram | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 40 | Erection of submercible pump set with laying pipeline with taps, at 1st Main Kalappa Block Okalipuram selvanagar Ramachandrapuram Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 41 | Drilling of Borewell and erection of cistern with electrification at Old Savarlane Rishaldar Streeet Cross Sheshadripuram Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 42 | Erection of Submercible pumpset with laying pipeline with taps. At Old Savarlane Rishaldar Street Cross Sheshadripuram Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 43 | Drilling of Borewell and erection of cistern with electrification at V.V.Giri Colony Gandhinagar ward No.94 Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 44 | Erection of submercible pump set with laying pipeline with taps. At V.V.Giri Colony Gandhinagar ward No.94 Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 45 | Construction of Public Library at Sri Saibaba Nagar Welfare Association No.65 Saibaba nagar 9th Main road Srirampura Bangalore-560021 | 25.00 | under progress | Nirmiti Kendra | 12.50 | 12.50 |
2012-13 | 46 | community hall for dattatreya ward no 77. dattatreya temple, no 2, pipeline malleshwaram, bangalore | 13.70 | Completed | Nirmiti Kendra | 13.70 | 0.00 |
2012-13 | 47 | Building repair for student hall food and shelter, Samapagiramanagara, ward no 110. Tagodaveera Kshatriya sangha, no 22/1, raja ram mohan roy road, sampangiramanar, bangalore | 10.00 | under progress | Nirmiti Kendra | 5.00 | 5.00 |
2012-13 | 48 | Construction of New Building in Government Higher Primary School R.S.Palya at Ward No. 28 Kammanahalli | 25.00 | Completed | Nirmiti Kendra | 25.00 | 0.00 |
2012-13 | 49 | Drilling of borewell and erection of cistern with electrification at Laskman Rao Nagar Subasnagar opp–Ranka Okalipuram ward No.95 Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 50 | Erection of submercible pump set with laying pipiline with taps at Laskman Rao Nagar Subasnagar Opp -Ranka Okaliuram ward No.95 Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 51 | Drilling of borewell and erection of cistern with electrification at Lashmana puri Gandhinagar Ward No 94 Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 52 | Erection of submercible pump set with laying pipeline with taps at Lakshmana Puri Gandhinagar Ward No 94 Bangalore | 2.50 | Completed | EEPRED | 2.50 | 0.00 |
2012-13 | 53 | Supply of 2 No.s Dialysis Machines at Samudhaya Bhavana Kadugondanahalli Ward No .30 Bangalore | 16.10 | Completed | Nirmiti Kendra | 16.10 | 0.00 |
2012-13 | 54 | Construction of School Building SSK Sangha at SSk Primary and Middle School (Govt Sided School ) Somavamsha Saharsa Srjuna Kshtriya (Pattegar) Sangha Regd #2, SSK Bhavan KV Temple Street Balepet Chickpet Ward No.109 Bangalore-560058 | 9.20 | under progress | Nirmiti Kendra | 0.00 | 9.20 |
2012-13 | 55 | Construction of School Building SSK Sangha at SSK Primary and Middle School (Govt Aided School ) Somavamsha Sahara Arjuna Kshtriya (Pattegar) Sangha Regd #2, SSK Bhavan KV Temple Street Balepet Chickpet ward No.109 Bangalore-560058 | 13.00 | under progress | Nirmiti Kendra | 0.00 | 13.00 |
2012-13 | 56 | Supply of 9 Computers with Everon UPS-1 No. and HP Laser Jet Printer-1 No. at SSK Sangha at SSK Primary and Middle School (Govt Aided School ) Somavamsha Sahara Arjuna Kshtriya (Pattegar) Sangha Regd #2, SSK Bhavan KV Temple Street Balepet Chickpet Ward No.109 Bangalore-560058 | 3.59 | Completed | M/s Emerge Technologies | 3.59 | 0.00 |
2012-13 | 57 | Drilling borewell and Submercible pump set panel Board Overhead Tank Water Pipe with taps at near swastik School Sanjeevappa Galli Chickpet Ward No109, Bangalore | 5.00 | under progress | EEPRED | 2.50 | 2.50 |
2012-13 | 58 | Drilling of Borewell submercible pupm set panel Board Overhead Tank Water pipe with taps at Near Sourastrapet Chickpet ward No.109 Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 59 | Drilling of Borewell submercible pupm set panel Board Overhead Tank Water pipe with taps at in front of Anjaneyaswamy Temple Narayanasettypet Chickpet ward No 109 Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 60 | Drilling of Borewell submercible pumpset panel board overhead tank water pipe with taps near Maramma Temple D.K.Lane Chickpet ward No.109 Bangalore | 5.00 | Completed | EEPRED | 5.00 | 0.00 |
2012-13 | 61 | Drilling of borewell submercible pump set panel board overhead tank water pipe with taps near 27th cross R.T.Road chickpet Ward No 109 Bangalore | 5.00 | under progress | EEPRED | 2.50 | 2.50 |
2012-13 | 62 | Drilling of Borewell Submercible pump set panel Board overhead tank water pipe with taps near 17th cross cubbonpet chickpet ward no 109, Bangalore | 5.00 | under progress | EEPRED | 2.50 | 2.50 |
2012-13 | 63 | Drilling of Borewell Submercible pump set panel board overhead tank water pipe with taps near 24th cross kilari road, Chickpet ward No 109 Bangalore | 5.00 | under progress | EEPRED | 2.50 | 2.50 |
2012-13 | 64 | Computers 10 Nos, Printer-01 No, Projector-01 No. U.P.S.-01 No. at Labourers fellowship school # 22 Risaldhar street sheshadripuram Bangalore-560020 | 5.05 | Completed | M/s Emerge Technologies | 5.05 | 0.00 |
2012-13 | 65 | Construction of school building ward No 24 Govt primary school HBR 1st Block Kacharakanahalli Bangalore | 16.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 16.00 |
2012-13 | 66 | Construction of Public Toilets ward No 24 HBR 1st Block Bangalore-84 | 3.50 | Estimated awaited | Nirmiti Kendra | 0.00 | 3.50 |
2012-13 | 67 | Drilling of Borewell & Erection of Cistern with Electrification | 2.50 | Completed | Nirmiti Kendra | 2.50 | 0.00 |
2012-13 | 68 | Erection of Submercible pumpset with laying pipeline with taps | 2.50 | under progress | Nirmiti Kendra | 0.00 | 2.50 |
2012-13 | 69 | Construction of Hightech public toilets ward no 100 Nethaji subhash Chandra Bose Playground Basaveshwara nagar Bangalore | 10.00 | Estimated awaited | Nirmiti Kendra | 0.00 | 10.00 |
2012-13 | 70 | Free Student Hostel building for Andra Devanga community, #4, 4th cross, 5th Main road, Hanumantappa road, Gandhi nagara, Bangalore | 25.00 | under progress | Nirmiti Kendra | 12.50 | 12.50 |
2012-13 | 71 | Rooms for Saniguruvanahalli Govt school, Basaveshwara Nagara ward. No.100 | 22.00 | under progress | Nirmiti Kendra | 0.00 | 22.00 |
2012-13 | 72 | 3 rooms construction for Jyothipura Govt School, Bengaluru east taluk, Bidarahalli hobli, Manduru grama panchayat, | 15.00 | under progress | Nirmiti Kendra | 0.00 | 15.00 |
2012-13 | 73 | Temple pond modification work, Someshwara temple, Manduru village, Bengaluru east village, bidarahalli hobli, | 17.00 | under progress | Nirmiti Kendra | 0.00 | 17.00 |
2012-13 | 74 | Construction of Samudayabhavan at ward No.141, Kasturibanagar, Bangalore-18 | 20.00 | Estimated awaited | EEPRED | 0.00 | 20.00 |
502.84 | 309.64 | 193.20 | |||||
2011-12 | 1 | Construction of High Tech toilets and bath rooms in Brahmana Vidyarthi Sahaya Sangha Sheshadripuram, Bangalore-20 | 5.00 | completed | Nirmithi kendra | 5.00 | 0.00 |
2011-12 | 2 | Construction of Two Library rooms at Govt. P.u.College Varthuru Mahadevapura Assembly const. | 10.00 | completed | Nirmithi kendra | 10.00 | 0.00 |
2011-12 | 3 | Supply of Computers and printersd to Nau Bahar Shah School, [Govt. Aided school] No:140, Mackane road, Bharathinagar, Bangalore-1 | 3.04 | completed | Maruthi computers Enterprises | 3.04 | 0.00 |
2011-12 | 4 | Construction of Senior Citizen Bhavana Ward no: 58, New Thippasandra HAL 3rd stage C.V.Raman nagara const.[1st stage] | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 5 | Construction of Senior Citizen Bhavana Ward no: 58, New Thippasandra HAL 3rd stage C.V.Raman nagara const.[2nd stage] | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 6 | Construction of Stri Shakthi Bhavan Ward No: 58, New Thippasandra HAL 3rd stage C.V.Raman Nagar, Const.[Stage-1] | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 7 | Construction of Stri Shakthi Bhavan Ward No: 58, New Thippasandra HAL 3rd stage C.V.Raman Nagar, Const.[Stage-2] | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 8 | Construction of Sanskruthi Bhavan of Kannada Sanskruthi mahila Koota, Ward No: 58, New Thippasandra HAL 3rd stage C.V.Raman Nagar, Const. | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 9 | Construction of Class rooms at B.B.M.P Urdu School Jagjeevanram nagar, Chamarajapet Assembly const. | 2.50 | completed | EEPRED | 2.50 | 0.00 |
2011-12 | 10 | Construction of office room at B.B.M.p Urdu School J.J.R. Nagar Ward no:137, Chamarajapet Assembly const.-1 | 2.50 | completed | EEPRED | 2.50 | 0.00 |
2011-12 | 11 | Construction of office room at B.B.M.p Urdu School J.J.R. Nagar Ward no:137, Chamarajapet Assembly const.-2 | 2.50 | completed | EEPRED | 2.50 | 0.00 |
2011-12 | 12 | Construction of Staged Urinals block B.B.M.P Urdu school J.J.R. nagar ward No: 137, Chamarajpet Assembly const. | 2.50 | completed | EEPRED | 2.50 | 0.00 |
2011-12 | 13 | Additional construction of class rooms at new fort-school and college Pampa Mahakavi Road, Ward No: 140, Chamarajpet Assembly const. | 2.50 | completed | EEPRED | 2.50 | 0.00 |
2011-12 | 14 | Construction of class rooms at new fort college Pampa Mahakavi road, Ward No: 140, Chamarajpet Assembly const. | 2.50 | completed | EEPRED | 2.50 | 0.00 |
2011-12 | 15 | Construction of Library room at new fort-school and college Pampa Mahakavi Road, Ward No: 140, Chamarajpet Assembly const. | 2.50 | completed | EEPRED | 2.50 | 0.00 |
2011-12 | 16 | Construction of Laboratory at new fort-school and college Pampa mahakavi road, Ward No: 140, Chamarajpet Assembly const. | 2.50 | completed | EEPRED | 2.50 | 0.00 |
2011-12 | 17 | Construction of Staff room at new fort-school and college Pampa mahakavi road, Ward No: 140, Chamarajpet Assembly const. | 2.50 | completed | EEPRED | 2.50 | 0.00 |
2011-12 | 18 | Construction of Sri.Samavasha Sahasarjuna Skshathriya Samaja Hostel Sheshadripuram, Banglaore | 15.00 | completed | EEPRED | 15.00 | 0.00 |
2011-12 | 19 | Construction of Aduditorium and Hitech library building at no: 19, Yadava Sangha HRBR Extn, Banasavadi Main Road, Bangalore | 25.00 | under progress | EEPRED | 12.50 | 12.50 |
2011-12 | 20 | Costruction of Hitech library building Bangalore Thamil Sangham Mudaliar road, Shivajinagar, Bangalore | 16.70 | completed | EEPRED | 16.70 | 0.00 |
2011-12 | 21 | Construction of Govt. Junior Primary Scbhool at ward No: 58 Byrasandra C.V.Raman nagar Ass. Const [Stage-1] | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 22 | Construction of Govt. Junior Primary Scbhool at ward No: 58 Byrasandra C.V.Raman nagar Ass. Const [Stage-2] | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 23 | Construction of New Kalyani and developmental works at ward No: 80 Maramma devi temple at Hoysalanagar, C.V.Raman nagar Const. Bangalore [Stage-1] | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 24 | Construction of New Kalyani and developmental works at ward No: 80 Maramma devi temple at Hoysalanagar, C.V.Raman nagar Const. Bangalore [Stage-2] | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 25 | Construction of New Kalyani and developmental works at ward No: 80 Maramma Devi temple at Hoysalanagar, CVRaman nagar Const. Bangalore [Stage-3] | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 26 | Construction of New Kalyani and developmental works at ward No: 80 Maramma devi temple at Hoysalanagar, C.V.Raman nagar Const. Bangalore [Stage-4] | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 27 | Construction of Devanga Sangha college building Devaga Hostel road, S.R.Nagar, Bangalore | 15.00 | completed | Nirmithi kendra | 15.00 | 0.00 |
2011-12 | 28 | Drilling of borewell at venkataram nagar ward no:140, and 141, Valmikinagar Bangalore | 5.35 | completed | EEPRED | 5.35 | 0.00 |
2011-12 | 29 | Providing submercible pump, panel borard, overhead tank, pipes and taps at venkataram nagar ward no:140, and 141, Valmikinagar Bangalore | 5.35 | completed | EEPRED | 5.35 | 0.00 |
2011-12 | 30 | Drilling of borewell and providing sumercible pumpset panel road, overhead tank, water poipes with taps at – Salappa Layout Ward No: 137, Bangalore | 5.35 | completed | EEPRED | 5.35 | 0.00 |
2011-12 | 31 | Drilling of borewell and providing sumercible pumpset panel road, overhead tank, water poipes with taps at – Padarayana palya Ward No: 138, Bangalore | 5.35 | completed | EEPRED | 5.35 | 0.00 |
2011-12 | 32 | Drilling of borewell and providing sumercible pumpset panel road, overhead tank, water poipes with taps at -Ranasinghpet Ward No: 139, Bangalore | 5.35 | completed | EEPRED | 5.35 | 0.00 |
2011-12 | 33 | Drilling of borewell and providing sumercible pumpset panel road, overhead tank, water poipes with taps being at Nagavara Govt School Ward No: 24, Sc/ST colony, Bangalore | 5.35 | completed | EEPRED | 5.35 | 0.00 |
2011-12 | 34 | Construction of Anganwadi building and computer centre ground floor and first floor at K.G.Halli, wardNo; 30 Bangalore | 17.00 | completed | EEPRED | 17.00 | 0.00 |
2011-12 | 35 | Construction of hitech library building at ward No; 108, Sri.Vitala Mandira Trust, # 691, 45 cross, 3rd block, Rajajinagar, Bangalore-10 | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 36 | Construction of Modern Smart class rooms at Terrace area ward No: 49, Dr. Chandrashekar Institute of Speech and hearing Hennur road, Lingarajapuram, Bangalore | 25.00 | completed | Nirmithi kendra | 25.00 | 0.00 |
2011-12 | 37 | Construction of rooms in Gandhi vidya school ward No: 97, Dayanandanagar, Srirampura, Bangalore | 20.00 | completed | EEPRED | 20.00 | 0.00 |
2011-12 | 38 | Construction of 3 class rooms at I.M.N.Govt aided school, ward No: 91, Bangalore | 17.00 | completed | EEPRED | 17.00 | 0.00 |
2011-12 | 39 | Installing grills to N.B.S. Govt primary and High school, Kackan Road, Ward no: 80, Bangalore | 2.00 | completed | EEPRED | 2.00 | 0.00 |
2011-12 | 40 | Construction of toilets at ward No: 110, city civil court Shivajinagar, Bangalore | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2011-12 | 41 | Community hall construction work at Hoodi ward – Bairati Bande | 10.00 | Estimated awaited | EEPRED | 0.00 | 10.00 |
2011-12 | 42 | Community hall construction work at Vinayakanagara – Vartur ward, Gunjur | 10.00 | Estimated awaited | EEPRED | 0.00 | 10.00 |
2011-12 | 43 | Community hall construction work at Kodati Panchayiti – Kodati colony | 10.00 | Estimated awaited | EEPRED | 0.00 | 10.00 |
2011-12 | 44 | Community hall construction work at Hoodi ward – Tigalara Palya (A K colony) | 10.00 | Estimated awaited | EEPRED | 0.00 | 10.00 |
2011-12 | 45 | 4 Rooms construction work to Govt Primary school, Bilishivale, Hoodi ward | 26.00 | Estimated awaited | EEPRED | 0.00 | 26.00 |
2011-12 | 46 | 2 rooms construction work to Govt Primary School Hagadur ward, Nallurahalli | 13.00 | Estimated awaited | EEPRED | 0.00 | 13.00 |
2011-12 | 47 | Work for Urdu School, Narattahalli, Marattahalli ward | 13.00 | Estimated awaited | EEPRED | 0.00 | 13.00 |
2011-12 | 48 | Compound Construction work for Newly Sanctioned Graveyard, Vartur ward | 5.00 | Estimated awaited | EEPRED | 0.00 | 5.00 |
2011-12 | 49 | Communityhall construction work, Hoodi ward, Bilishivale | 10.00 | Estimated awaited | EEPRED | 0.00 | 10.00 |
2011-12 | 50 | Toilet construction, GYM construction and Gym material supply for ward No. 112, Dommalur, HAL 2nd stage, 13th Main road Park | 20.00 | Estimated awaited | EEPRED | 0.00 | 20.00 |
2011-12 | 51 | Primary school repair work, Ward number 112, Doopanahalli, Bengaluru | 5.00 | Estimated awaited | EEPRED | 0.00 | 5.00 |
2011-12 | 52 | Modernisation and Computerisation of Wxisting Library at Ward No.110, Sampangiram nagar City Civil Court Complex | 25 | Estimated awaited | EEPRED | 0 | 25 |
2011-12 | 53 | Re-Trofitting of Essential Life Line Building to Gangamma Thimmaiah Govt School at ward No.107, Shivaji nagar, Bangalore-10 | 10.00 | Estimated awaited | EEPRED | 0.00 | 10.00 |
2011-12 | 54 | Ward no.101, Kamakshipalya, Panchajanya education trust ® , KHB colony, Basaveshwara Nagar, School building construction work | 20.00 | Estimated awaited | EEPRED | 0.00 | 20.00 |
2011-12 | 55 | ward No. 28, Kammanahalli, subbayyanapalya, Bengaluru Community hall construction | 30.00 | Estimated awaited | EEPRED | 0.00 | 30.00 |
Total | 572.34 | 342.84 | 229.50 | ||||
2010-11 | 1 | Construction of Library rooms at B.K.Mariappa Charities 3rd main road, Chamarajapet, Bangalore-18 | 5.00 | under progress | Nirmithi kendra | 2.50 | 2.50 |
2010-11 | 2 | Construction of School building at Vanitha Seva Mandira 11th block, Rajajinagar, Bangalore | 10.00 | completed | Nirmithi kendra | 10.00 | 0.00 |
2010-11 | 3 | Construction of Food Shelter for the Students St.Xavier’s High School Shivajinagar, Bangalore-51 | 10.00 | completed | EEPRED | 9.95 | 0.05 |
2010-11 | 4 | Construction of School building Sri.Sharada Vidya Mandira, Balagere road, Varthuru, Bangalore-87 | 10.00 | completed | EEPRED | 9.95 | 0.05 |
2010-11 | 5 | Construction of Indoor Badminton Court D-block, Rajajinagar, Nerar Sai college, Bangalore [1st stage] | 10.00 | completed | EEPRED | 9.95 | 0.05 |
2010-11 | 6 | Construction of Indoor Badminton Court D-block, Rajajinagar, Nerar Sai college,Bangalore [2nd stage] | 10.00 | completed | EEPRED | 9.95 | 0.05 |
2010-11 | 7 | Construction of Indoor Badminton Court D-block, Rajajinagar, Nerar Sai college, Bangalore [3rd stage] | 5.00 | completed | EEPRED | 4.98 | 0.03 |
2010-11 | 8 | Construction of High Tech Toilets at Government High School Pallavi Talkies Backside, Sampangirama nagar, Bangalore [Stage-I] | 2.50 | completed | EEPRED | 2.49 | 0.01 |
2010-11 | 9 | Construction of High Tech Toilets at Government High School Pallavi Talkies Backside, Sampangirama nagar, Bangalore [Stage-II] | 2.50 | completed | EEPRED | 2.49 | 0.01 |
2010-11 | 10 | Construction of High Tech Toilets at Government High School Pallavi Talkies Backside, Sampangirama nagar, Bangalore [Stage-III] | 2.50 | completed | EEPRED | 2.49 | 0.01 |
2010-11 | 11 | Construction of High Tech Toilets at Government High School Pallavi Talkies Backside, Sampangirama nagar, Bangalore [Stage-IV] | 2.50 | completed | EEPRED | 2.49 | 0.01 |
2010-11 | 12 | Construction of Indoor Badminton court at 1st block, Rajajinagar near Sai college, Prakashnagar, Ward Rajajinagar Assembly constituency Bangalore | 10.00 | completed | EEPRED | 9.95 | 0.05 |
2010-11 | 13 | Providing water pipe line and public taps works at Main and cross roads at 1] Kamakshipalya 5th and 6th cross, 7th cross roads 2] Kamakshipalya 1st , 4th 5th, 7th , 8th and 30th main roads 3] Meenakshinagar 5th, 6th 7th Main road, 4] Construction & beds to public Taps | 21.50 | completed | EEPRED | 21.39 | 0.11 |
2010-11 | 14 | Providing piped water supply scheme and Construction of one lakh citer capacity of over head tank mandur village Bidarahalli Hobli Bangalore East Taluk | 19.00 | under progress | EEPRED | 12.00 | 7.00 |
2010-11 | 15 | Construction of School Rooms in Sri.Sikddaganga School Shivanagara Ward Rajajinagar, Assembly const. | 20.00 | completed | EEPRED | 20.00 | 0.00 |
2010-11 | 16 | Construction of Anganawadi building ward no:28, Kamanahally Sarvagnanagar Division, Bangalore | 9.50 | under progress | Nirmithi kendra | 4.75 | 4.75 |
2010-11 | 17 | Constructio of School and Hostal building devanga Sangha Devanga Hostel road, S.R.Nagar, Bangalore [Stage-1] | 5.00 | completed | EEPRED | 4.98 | 0.02 |
2010-11 | 18 | Constructio of School and Hostal building devanga Sangha Devanga Hostel road, S.R.Nagar, Bangalore [Stage-2] | 5.00 | completed | EEPRED | 4.98 | 0.02 |
2010-11 | 19 | Construction of Anganawadi building at Flower Garden Main road, Cheluvadipalya, Ward No:138, Bangalore-18 | 19.90 | under progress | BBMP | 9.80 | 10.10 |
2010-11 | 20 | Construction of High Tech Dining Hall and High Tech Library building in Karnataka Pradesh Arya Idigara Sangha -185, Idiga Bhavan 2nd floor RajeevGandhi Circle, Sheshadripuram, Bangalore | 25.00 | completed | Nirmithi kendra | 25.00 | 0.00 |
Total | 204.90 | 180.08 | 24.82 | ||||
2009-10 | 1 | The construction building of Astagrama Association in 1st floor at No:46, Astagrama Sanga Layout Magadi Main road, Bangalore-79 | 2.50 | completed | Nirmithi kendra | 2.50 | 0.00 |
2009-10 | 2 | Construction of School building at Rastrothana parishath Jai Gopal Garoda Rastrothana Vidyalaya Site No: 21, 1st blopck, Kalyanagar, H.R.B.R layout, Bangalore | 15.00 | completed | EEPRED | 15.00 | 0.00 |
2009-10 | 3 | Construction of Karnataka Chitrakala parishath building at Kumara park East, Bangalore | 5.00 | completed | EEPRED | 5.00 | 0.00 |
2009-10 | 4 | Construction of school and hostal building of General Hostel Karnataka Thigala Samajika vidyabhivruddhi Sangha 10th main 5th block, Rajajinagar, Bangalore | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2009-10 | 5 | Construction of High School building at Mudaliyar Sena Sangha No:8, 6th cross, Prakash Nagar, Bangalore | 15.00 | completed | EEPRED | 15.00 | 0.00 |
2009-10 | 6 | Drilling of borewell along with pump set -& P.V.C Pipeline at Rajajinagar Constituency in ward No: 101, Kamakshipalya Bangalore | 8.00 | completed | EEPRED | 8.00 | 0.00 |
2009-10 | 7 | Drilling of Borewell along with pump set 2 P.V.C pipeline at 4th H-Block Srirama mandir ward Rajajinagar Assembly constituency | 6.00 | completed | EEPRED | 6.00 | 0.00 |
2009-10 | 8 | Drilling of Borewell along with pump set & P.V.C pipeline at prakashnagar,Rajajinagar Assembly constituency | 9.60 | completed | EEPRED | 9.60 | 0.00 |
2009-10 | 9 | Construction of Samudhaya Bhavan Building-Nayaka Community at All India Nayaka Sangha CA Site No.01, 11th Main, 3rd Stage, 1st Block Basaveshwara Nagara Bangalore | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2009-10 | 10 | Construction of High tech toilets at siddaganga school premises Shivanagara ward Rajajinagar Assembly const. | 7.00 | completed | EEPRED | 7.00 | 0.00 |
2009-10 | 11 | Construction of Samskruthika bhavan at Mahaganapathinagar, Shivanagar ward, Rajajinagar Assembly const. | 3.00 | completed | EEPRED | 3.00 | 0.00 |
2009-10 | 12 | Construction of Samudhaya bhavan at Valepura Mahadevapura Assembly constitution Bangalore | 5.00 | completed | EEPRED | 5.00 | 0.00 |
2009-10 | 13 | Construction of Samudhaya bhavan at Bayyappanahally Mahadevapura Assembly constitution Bangalore | 5.00 | completed | EEPRED | 5.00 | 0.00 |
2009-10 | 14 | Construction of Samudhaya bhavan at Nimbekayipura Mahadevapura Assembly constitution Bangalore | 5.00 | completed | EEPRED | 5.00 | 0.00 |
2009-10 | 15 | Construction of Samudhaya bhavan at Yarappanahally, Mahadevapura Assembly constitution Bangalore | 5.00 | completed | EEPRED | 5.00 | 0.00 |
2009-10 | 16 | Construction of Burial ground (Chithagara) at Bidarahalli village, mahadevapura Assembly const. | 5.00 | completed | EEPRED | 5.00 | 0.00 |
2009-10 | 17 | Drilling of Borewell alongwith pump set & PVC line at Banasavadi village, Bangalore | 6.20 | completed | EEPRED | 6.20 | 0.00 |
2009-10 | 18 | Drilling of Borewell alongwith pump set & PVC line at A.K.Colony, Banasavadi ward no 43, Bangalore | 6.20 | completed | EEPRED | 6.20 | 0.00 |
2009-10 | 19 | Construction of hostal building of General Hostel K.I.S.V. Sanga 10th main road, 5th block, Rajajinagar, Bangalore-10 | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2009-10 | 20 | Drilling of Borewell along with pumpset and PVC pipe at 2nd A-Main road, Ramachandrapura Okalipuram,ward Gandhinagar Assembly const., Bangalore | 5.40 | completed | EEPRED | 5.40 | 0.00 |
2009-10 | 21 | Drilling of borewell along with pumpset and PVC pipe at cottonpet ward No: 120 T.D.Lane, Bangalore | 5.00 | completed | EEPRED | 5.00 | 0.00 |
2009-10 | 22 | Drilling of borewell alongwith pumpset and PVC line at cottonpet ward no:120, K.P.Agrahara Main road, Bangalore | 4.30 | completed | EEPRED | 4.30 | 0.00 |
2009-10 | 23 | Purchase of 2 computers to united mission primary and Middle school, Mission road, Bangalore-27 | 0.74 | completed | Abhishek enterprises | 0.74 | 0.00 |
2009-10 | 24 | Construction of Indoor Badminton Cart at D Block, Rajaji Nagar, Near Sai College, Prakash Nagar ward Rajajinagar Assembly Constituency Bangalore | 15.00 | completed | EEPRED | 15.00 | 0.00 |
2009-10 | 25 | Construction of Samaloch Bhavan at Karnataka Chitrakala Parishath campus Kumarakrupa road, Bangalore | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2009-10 | 26 | Rastrothana Parishath construction of Nandagokula building at Rastrothana Parishath Site No: 2, Magadi Road, Vinayaka H.B.C.S, Bangalore | 15.00 | completed | EEPRED | 15.00 | 0.00 |
2009-10 | 27 | Construction of Samudhaya Bhavan at Karnataka Chitrakala Parishath compound, Kumarakrupa Road, Bangalore-01 | 10.00 | completed | EEPRED | 10.00 | 0.00 |
2009-10 | 28 | Construction at School Rooms and Toilets at Government Goys Urdu Model Primary School, J.J.R. Nagar, Bangalore | 10.00 | completed | EEPRED | 10.00 | 0.00 |
Total | 213.94 | 213.94 | 0.00 |
Related Articles
Traffic seems to be a major issue in this constituency. Every day, when i woke up, i can see lines of vehicles queued up,trying to sneak away past the signal momentarily. But, it is not only the MP who has to resolve this issue. The onus lies on citizens as well, who recklessly drive vehicles. Everyday i commute to office, i can see that there is a huge jam and in each and every car, single person is sitting. Wouldn’t it be good if we do car pooling.Most of us are IT employees and we flock to EPIP or ITPB , and we do display enthusiasm in our company sponsored CSR activities, but when it comes to common sense, we lack. We never gave chance to ourselves for improvement. If we make a habit that we can carry along 3-4 persons in our car, traffic problem will ease a bit. All of us are in hurry to reach office, without caring what shortcuts or traffic violations we make. I am not taking side of this MP, but in order to raise complain, we should be in a position to raise our voice. Every weekday, post 8:30 am , you can see ruckus everywhere. We do want change, but we won’t change ourselves . What great citizens we are . Just to make it simple, vote to that person, whom you think is worthy enough and that candidate will be worthy, only if you think that you are worthy and responsible citizen of this country and you will cast your vote judiciously Rest is your choice.
Mahadevpura is one of the constituency under Mr P.C. Mohan which is totally neglected. Roads and footpaths here are worst than many rural areas, Traffic condition is chaotic. Even there has been fatal accidents like a baby getting crushed under truck, but nothing changed.
Also, most of the expenses written above are over-inflated. Does it take 10 lac Rs to build a toilets (refer expense 8,9,10,11 in year 2010-11) ? Pure waste of tax-payer’s money.
How come majority of the works are carried out by EEPRED? They seem to bag all the tenders??? Only building more and more toilets is not going ot help.!! What has he done to improve major issues in this constituency like traffic, terrible road conditions, increasing dust and pollution?
Who’s Emerge Tech/EEPRED? How do these projects get prioritized?
This MP is better than the other MP, who has spent the entire amount in all projects completed, without any balance leftover. The cost of certain things are not at par with the market pricing, especially the electronic items provided to the schools and other institutions. It must be taken as a duty to keep a tap on those projects, as to whether they are functioning properly / material is in tact in its place OR being misused etc.
Wonderful job, he has covered almost all areas under his constituency
Will be interesting to correlate with what the Mahadevapura MLA had claimed as his personal achievement around the same time last year…. I remember the booklet brought out by him claiming construction of community halls across all wards… I find a mention of the same here….