Check what your MP has done: D B Chandregowda, Bangalore North

This is the list of works done by D B Chandregowda, MP of Bangalore North, using the Member of Parliament Local Area Development Scheme (MPLADS) fund, in last five years.

In the five years that he was an MP for Bangalore North, D B Chandre Gowda spent a little over Rs. 19 crores from his MPLAD funds. Some salient features of the MP utilisation are given below.

 

  • Over Rs 15 crores on road improvement projects.
  • A little over Rs 1.5 crores spent on civic amenities which includes construction of community halls, improving social infrastructure facilities and the like.
  • Water has the third highest spending with a little over Rs. 1.23 crores. The main component of this is sinking borewells with the odd provision of water tanks and water connections to underprivileged communities.
  • Not surprisingly (as is the case with most MPs), education and health projects get the lowest priority with a combined fund utilisation of a little over Rs. 44 lakhs.
  • No sanitation projects have been funded under the MPLAD fund scheme.
  • The total number of projects funded under the MPLAD funds – 391.

We encourage and invite our readers to check the list and see whether the work has actually been done, if yes, check the quality of work, cost to quality ratio etc. You can comment below the article with your inputs.

The data shows the work done from 2009-10 to 2013-14, and shows even the works under progress. Your feedback will help us in analysing the data.

Disclaimer:

1) The data has been obtained from Bangalore Urban Deputy Commissioner’s office. It has been presented here in its original shape, format and spellings.

2) Citizen Matters is not responsible for the errors if any, as the data has been produced in its original form, with minimum correction/ translation.

 

Physical and Financial Progress on Implemntation of MPLADS works in Bangalore North
Year  No Name & Location of the work Estimate (Lakhs) Status Implementing Agency Amount released Balance If any
2013-14 1 Road development work, Maruthi Nagara, Bangalore north Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 2 Concrete work 0-75 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 3 Concrete work 75-150 meters, SC colony, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 4 Concrete work , From Main road to Yallappa home, Gulbarga slum, Maruthi Nagara, Bangalore north Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 5 Road development work, from Venkataswamy home to Chikkavenkatappa home, Maruthi Nagara, Bangalore north Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 6 Road development work, from Ganapathi nagara Main road to Narasimhayya home, Bangalore north Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 7 Concrete Road work, Chikkabanavara village, Bangalore north Talluk, 5 Under Progress EE PRED, Bangalore 0 5
2013-14 8 Concrete road work, 1st cros, Dasappanapalya, Bangalore north Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 9 Concrete road work,2nd cross, Dasappanapalya, Bangalore north Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 10 Concrete road work, 3rd cross, Dasappanapalya, Bangalore north Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 11 Road development work, 1st cross, Kansiram Nagara, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 12 Road development work, 2nd cross, Kansiram Nagara, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 13 Road development work, 1st cross, Ananda Garden road, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 14 Road development work, 2nd cross, Ananda Garden road, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 15 Road development road, Sadguru Layout, Bangalore North Layout 5 Completed EE PRED, Bangalore 5 0
2013-14 16 Road development work, Main road, Shiradi Layout, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 17 Road development work, 1st cross road, Shiradi Layout, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 18 Road development work, 2nd cross road, Shiradi Layout, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 19 Road development work, Netravathi Layout, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 20 RCC Gutter work, Lakshmipura mainroad, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 21 1 Borewell digging work for Bagaluru village, Bagalur Gramapanchayath, Jala hobli, Bangalore north taluk 2 Under Progress EE PRED, Bangalore 0 2
2013-14 22 Road development work, Kodigehalli mainroad to borewell, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 23 Road development work, Kudalasangama Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 24 Road development work, Nanjundeshware layout Main road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 25 Road development work, 1st & 2nd cross, Ratnanagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 26 Road development work, Commnity hall mainroad, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 27 Road development work, Kuvempu Nagara, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 28 Road development work, Kodigehalli main road to Kodigehalli lake road, Kodigehalli Gramapanchayath, Yashwanthpura Hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 29 Road development work stage – 1, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency 5 Completed EE PRED, Bangalore 5 0
2013-14 30 Road development work stage – 2, Pillappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency 5 Completed EE PRED, Bangalore 5 0
2013-14 31 Road development work Stage – 1, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency 5 Completed EE PRED, Bangalore 5 0
2013-14 32 Road development work , from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency 5 Completed EE PRED, Bangalore 5 0
2013-14 33 Road development work Stage – 3, from Kalkere OM shakti Teple to Kalkere lake road, Kalkere village, Bangalore North MP constituency 5 Completed EE PRED, Bangalore 5 0
2013-14 34 RCC Guttor work, Basaveshwara Layout, Kempapura, Bangalore north Talluk, 5 Completed EE PRED, Bangalore 5 0
2013-14 35 Road development work from Lakshmipura village to Lakshmipura Janata colony, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 36 Road development work stage – 1, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency 5 Completed EE PRED, Bangalore 5 0
2013-14 37 Road development work stage – 2, Motappa Layout, Kanakanagara, Channasandra village, Bangalore north MP constituency 5 Completed EE PRED, Bangalore 5 0
2013-14 38 Road developent work, Krishna Layout, Kalkere village, Bangalore north MP constituency 5 Completed EE PRED, Bangalore 5 0
2013-14 39 Road developent work, From Kalkere Graveyard to Patalappa home, Kalkere village, Bangalore north MP constituency 5 Completed EE PRED, Bangalore 5 0
2013-14 40 Concrete road work and road development work, Agara colony, Agara Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 41 Concrete road work and road development work, from Amrutanarayana swamy majjana bavi road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 42 Concrete road work and road development work, from Amrutanarayana swamy mountain road , Lingapura village, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 43 Student hostel constructio work, KR Puram vidhanasabha constituency, Shri ramakrishna vivekananda sadhana kshrethra ® Bangalore north MP constituency 5 Under Progress Nirmithi Kendra 2.5 2.5
2013-14 44 Road development work, from Karubele Mainroad to Panchayath, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 45 Concrete road construction work, from K.gollahalli main road to Dairy Krishnappa home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 46 Concrete road construction work, from Beerappa home to Papanna home, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 47 Concrete road construction work, from dalappa home to gramapanchayath new building, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 48 Cement concrete road construction work for rest of the village roads, chagalahatti village, Marenahalli gramapanchayatn, Jala hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 0 5
2013-14 49 concrete road construction in SPG colony, Tavarekere illage, Tavarekere hobli, yashwanthpra vidhasabha constituecny, bangalore south talluk 15 Under Progress Nirmiti Kendra 7.5 7.5
2013-14 50 RCC slab work, Kuvempunagara layout, Nanjundeshwara layout, Kodigehalli gramapanchayath, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 51 Road development work, Aniketana nagara mainroad, Kodigehalli gramapanchayath, Bangalore north taluk 5 Completed EE PRED, Bangalore 5 0
2013-14 52 Road development work, 1 & 2nd cross, Kodigehalli gramapanchayatn 5 Completed EE PRED, Bangalore 5 0
2013-14 53 Road development work, 3 & 4th cross, Kodigehalli gramapanchayatn 5 Completed EE PRED, Bangalore 5 0
2013-14 54 Road development work, from Kannalli Sigehalli gate to Banashankari Layout, Kodigehalli Gramapanchayath, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 55 Concrete road construticon, till suvarnamma home, Dasappanapalya, Yashwanthpura hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 56 Concrete road, Main road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk 4 Completed EE PRED, Bangalore 4 0
2013-14 57 Concrete road, cross road, New layout, Maruthi Nagara, Ganigarahalli village, Yashwanthpura hobli, Bangalore north talluk 4 Completed EE PRED, Bangalore 4 0
2013-14 58 concrete road work, from Kempapur main road to Palani home, Somashettihali gramapanchayath, Yashwanthpura hobli, Banglaore north talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 59 Concrete road work, from Palani home to vishwanath home, Kempapura mainroad, Somashetti halli gramapanchayath, yashwanthpura hobli, bangalorenorth talluk 5 Completed EE PRED, Bangalore 5 0
2013-14 60 Cement concrete road work, to 1st & 2nd crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli 5 Completed EE PRED, Bangalore 5 0
2013-14 61 Cement concrete road work, to 3rd and 4th crosss, Somashettihalli gramapanchayath, Yashwanthpura hobli 5 Completed EE PRED, Bangalore 5 0
2013-14 62 Road development work, 1st cross, Maruthi Nagara, Somashettihalli gramapanchayath, Yashwanthpura hobli 5 Completed EE PRED, Bangalore 5 0
2013-14 63 Formation and metalling the roads from kalkere pond road to Mr.Rajendra’s house in K.R Puram Hobli Bangalore urban District 5 Under Progress EE PRED, Bangalore 0 5
2013-14 64 and metalling the roads from Mr.Jaiprakash house to Kalkere Pond Road in K.R. Uram hobli 5 Under Progress EE PRED, Bangalore 0 5
2013-14 65 Formation and etalling the roads from kalkere pond road to Smt. Kanaka Ratnamma’s House in K.R,.Puram Hobli Bangalore 5 Under Progress EE PRED, Bangalore 0 5
2013-14 66 Formation and metalling the roads of jayalakshmi layout in kalkere village K.R.puram Hobli Bangalore 5 Under Progress EE PRED, Bangalore 0 5
2013-14 67 Formation and metalling the roads from Channasandra main road to Sri. Venkatesh Warappa Layout in K.R.Puram Hobli 5 Under Progress EE PRED, Bangalore 0 5
2013-14 68 Formation and metalling the roads in Kempaiah layout 1st & 2nd Cross road in K.R.Puram Hobli Bangalore 5 Completed EE PRED, Bangalore 5 0
2013-14 69 Improvement and metalling the roads in kempaiah layout for Mother teresa School roads in K.R.Puram hobli Bangalore 5 Completed EE PRED, Bangalore 5 0
2013-14 70 Formation and metalling the roads in Muniswamy layout 5th Cross in K.R.Puram Hobli Kanaka Nagar 5 Completed EE PRED, Bangalore 5 0
2013-14 71 Formation and metalling the roads of Mr. Shashidhar’s house in varanasi layout at K.R.Puram Hobli Bangalore Urban District 5 Completed EE PRED, Bangalore 5 0
2013-14 72 improvements and metalling the roads of Mr.Anand Kumar & Manohar House roads in Varanasi Layout at K.R.Puram Hobli 5 Completed EE PRED, Bangalore 5 0
2013-14 73 Improvemets and metalling in roads of Mr.Sandeep Reddy & Mr. Muniraju house roads in Varanasi layout at K.R.Puram Hoabli Bangalore 5 Completed EE PRED, Bangalore 5 0
2013-14 74 Road development work, 1st & 2nd Cross, richard layout, Kalkere village, Bangalore north MP constituency 5 Under Progress EE PRED, Bangalore 0 5
2013-14 75 Road development work, 3rd & 4th Cross, richard layout, Kalkere village, Bangalore north MP constituency 5 Under Progress EE PRED, Bangalore 0 5
2013-14 76 asphalting work, from Paradise home 2nd cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency 5 Completed EE PRED, Bangalore 5 0
2013-14 77 asphalting work, from Paradise home 2st cross to happy garden, sunil layout, channasandra village, Bangalore north MP constituency 5 Completed EE PRED, Bangalore 5 0
2013-14 78 Borewell digging work, Jagalahatti village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore north talluk 2 Under Progress EE PRED, Bangalore 0 2
2013-14 79 pump motor and Pipeline implementing work, Chagalahatti village, Bagaluru Gramapanchayath, Jala Hobli, Bangalore north talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 80 compound wall construciton, Daradahalli village temple, Mudigere talluk, Chikkamagaluru Dist 5 Completed DC Chikkamagalur 5 0
2013-14 81 Lingeshwara Lake development work, Daradahalli, Mudigere talluk, Chikkamagaluru dist 5 Completed DC Chikkamagalur 5 0
2013-14 82 formation of metalling the roads Mr.Krishnamurthy’s house roads in kalkere Village, Bangalore North Bangalore 5 Under Progress EE PRED, Bangalore 0 5
2013-14 83 Improvement and metalling the roads of Mr.Puttaswamy layout roads in Channasandra Village Bangalore North Parlimentary Constituency Bangalore 5 Under Progress EE PRED, Bangalore 0 5
2013-14 84 formation of Metalling the roads of Richard’s layout water Tank roads in Kalkere Village Bangalore North Parlimentary Constituency Bangalore 5 Under Progress EE PRED, Bangalore 0 5
2013-14 85 Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 86 Concrete road construction (chain 0 to85 meters) 9th cross, Near Cambridge School, Manjunath nagara, KR Pura hObli, Bangalore East talluk 5 Under Progress EE PRED, Bangalore 0 5
2013-14 87 Borewell digging work in New layouts of Tippenahalli and doddabidarakallu villages, Doddabidarakallu ward 4 Under Progress EE PRED, Bangalore 0 4
2013-14 88 UttaraKhand Floods rehabilatiton fund 10 0 10
    Total 446     253 193
2012-13 1 Borewell digging work, Coffee Board Layout welfare association ®, Hebbala Kempapura 2 Under Progress EE PRED, Bangalore 0 2
2012-13 2 Road development work Stage -1, Kannur village main road to Kannuru lake road, Yalahanka 5 Completed EE PRED, Bangalore 5 0
2012-13 3 Road development work Stage -12, Kannur village main road to Kannuru lake road, Yalahanka 5 Completed EE PRED, Bangalore 5 0
2012-13 4 Road development work, from Backword community colony to Main road, Kannuru village, Yalahanka 5 Completed EE PRED, Bangalore 5 0
2012-13 5 1 & 2nd cross Road development work, Backward community colony, Kannur village, Yalahanka 5 Completed EE PRED, Bangalore 5 0
2012-13 6 3 & 4th cross Road development work, Backward community colony, Kannur village, Yalahanka 5 Completed EE PRED, Bangalore 5 0
2012-13 7 Road development work Stage – 1, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 8 Road development work Stage -2, Maragondanahalli village Main road to Maragondanahalli Lake road, Channasandra Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 9 Road development work, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 10 Road development work, Cross road, Maragondanahalli village Mainroad to Ramaanjenaya Layout Mainroad, Channasandra, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 11 from Maragondanahalli village mainroad to Venkateshwara Layout road, Channasandra, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 12 Sri Vinayaka yuvakara Bhavana construction work, (youth association building) , Gonipura, Kengeri Hobli, K.gollahalli 6 Completed EE PRED, Bangalore 6 0
2012-13 13 Concrete road 0-75 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 14 Concrete road 75-1505 meters, CSR Layout Mainroad, Lakshmipura village, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 15 Concrete work for 1st cross, CSR Layout, Lakshmipura village, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 16 Concrete work for 2nd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 17 Concrete work for 3rd cross, CSR Layout, Lakshmipura village, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 18 Concrete work for 4th cross, CSR Layout, Lakshmipura village, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 19 Road development work, Mainroad, New Layout, Ganigarahalli Village, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 20 Road development work, 1 & 2nd Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 21 Road development work, 3 & 4th Cross road, New Layout, Ganigarahalli Village, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 22 Road development work, Ganesha Temple road, Dasappanapalya, ChikkaBanavara village, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 23 3 Borewell digging, Motor pump & Tank work, Ward 39, Nelagadarahalli, Ward 12 Shettihalli Lake view Defence colony, Ward no 143 Bagalakunte Layout, 12 Completed EE PRED, Bangalore 12 0
2012-13 24 Busstand construction, Tavarekere village, Tavarekere hobli, Bangalore South Talluk 5 Under Progress EE PRED, Bangalore 0 5
2012-13 25 CC road construction work, from Main road to till Amir saab home, Kengeri main road, Tavarekere village, Tavarekere hobli, Bangalore south talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 26 CC road construction work, Bank colony, Tavarekere village, Tavarekere Hobli, Bangalore south talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 27 Drinking water overhead Tank construction work, Vinayaka Nagara, Ramohalli Gramapanchayath Limits 10 Completed EE PRED, Bangalore 10 0
2012-13 28 Concrete road work, from Murugesh home to Hanumantappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk 4.9 Completed EE PRED, Bangalore 4.9 0
2012-13 29 Concrete road work, from Chennaveerayya home to Nanjappa home, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk 4.9 Completed EE PRED, Bangalore 4.9 0
2012-13 30 Concrete road work, from Indramma home to Anganavadi, Katanayakanapura village, H.Gollahalli Gramapanchayath, Bangalore south talluk 4.9 Completed EE PRED, Bangalore 4.9 0
2012-13 31 1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore 2 Completed EE PRED, Bangalore 2 0
2012-13 32 1 Borewell digging work, Channanayakanapalya, Nagasandra Post, Bangalore 2 Completed EE PRED, Bangalore 2 0
2012-13 33 Drinking water supply work, ChannaVenkatappa home street, Tagachaguppe Gonipura, K.Gollaholli Gramapanchayath Limits, Bangalore south talluk 4 Completed EE PRED, Bangalore 4 0
2012-13 34 Concrete road work stage – 1, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 35 Concrete road work stage – 12, from Veternary hospital to Ramesh bin Bullayya home, Somanahalli village, Bangalore south talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 36 Orphanage home, Cultural hall construction in 3 acers of land, Shree bhavana rushi padmapeeta mahasamstana ® , Ullala, Yashwanthpura hobli, Bangalore north talluk, 5 Completed EE PRED, Bangalore 5 0
2012-13 37 Tar road work, 790-948, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 38 Tar road work, 948-1106, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 39 Tar road work, 1106-1264, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 40 Tar road work, 1264-1422, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 41 Tar road work 0-158, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 42 Tar road work 158-316, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 43 Tar road work 316-474, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 44 Tar road work 474-632, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 45 Tar road work 632-790, Bhovipalya main road, Doddajala Gramapanchayath, Jaala Hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 46 Road development work, 1 & 2nd cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency, 5 Completed EE PRED, Bangalore 5 0
2012-13 47 Road development work, 3rd &4th cross, from Maragondanahalli Mainroad to NRI Layout, Bangalore north MP constituency, 5 Completed EE PRED, Bangalore 5 0
2012-13 48 Concrete construction work, from Narayana home to Chandru home, 4th Cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 49 Concrete construction work, from Martandappa home to Raj Electricles, 3rd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 50 Concrete construction work, from Dhanalakshmi home to Krishnegowda home, 2nd cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 51 Concrete construction work, from Ampanna home to Basavaraju home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 52 Concrete construction work, from Ravi home to Karuna home, 1st cross, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 53 Concrete construction work for cross roads, Maruthi Nagara, Somashettihalli Gramapanchayath Limits, Yashwanthpura hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 54 Concrete Guttor and Road construction work form, Main road to Mastappa home, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 55 Cement concrete road construction work 0-70, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 56 Cement concrete road construction work 70-140, Sistern Main road, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 57 Guttor construction work, Ashraya layout, Lakshmipura village, Somashettihalli Gramapanchayath , Yashwanthpura hobli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 58 Road development work 0 -500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 59 Road development work 500-1000, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 60 Road development work 1000-1500, Maragondanahalli Mainroad to NRI Layout road, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 61 Road development work, 5th & 6th cross road, NRI Layout, Maragondanahalli, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 62 Road development work, from Maragondanahalli mainroad lake main road to Kachaaramma temple road, Bangalore north MP constituency 5 Completed EE PRED, Bangalore 5 0
2012-13 63 Road development work, from shivaramegowda home to MWS borewell, Udaya Layout, Kodigehalli village, Yashwanthpura hobli 5 Completed EE PRED, Bangalore 5 0
2012-13 64 Road development work, 2nd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli 5 Completed EE PRED, Bangalore 5 0
2012-13 65 Road development work, 3rd cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli 5 Completed EE PRED, Bangalore 5 0
2012-13 66 Road development work, 4th cross from Shivaramegowda home, Udaya Layout, Kodigehalli village, Yashwanthpura hobli 5 Completed EE PRED, Bangalore 5 0
2012-13 67 Road development work, Kannur main road to Kannuru Lake road, Hosuru, Yalahanka, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 68 Parkinsons Agencing research foundation Indira nagar Bangalore 2.84 Completed Nirmithi Kendra 2.84 0
2012-13 69 2 Borewell digging work in Bhuvaneshwari Nagara layout 4 Completed EE PRED, Bangalore 4 0
2012-13 70 Concrete road work, from anil home to Anjeneya temple road, Veerashetti village, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 71 Concrete work for 1st cross, Veerashettihalli village, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 72 Road development work Stage – 1, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency 5 Completed EE PRED, Bangalore 5 0
2012-13 73 Road development work Stage – 2, from Kalkere Graveyard to Kalkere lake road, Bangalore North MP constituency 5 Completed EE PRED, Bangalore 5 0
2012-13 74 Dirinking water suppy, Tippenahalli, Doddabidarakallu Gramapanchayath, Bangalore 4 Completed EE PRED, Bangalore 4 0
2012-13 75 Drinking water supply to Saptagiri layout, Doddabidarakallu village 4 Completed EE PRED, Bangalore 4 0
2012-13 76 Gutter construction work, from Pipeline road, Vivekananda nagara, Bangalore north MP constituency 5 Completed EE PRED, Bangalore 5 0
2012-13 77 Cement concrete road work, 1st cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny 5 Completed EE PRED, Bangalore 5 0
2012-13 78 Cement concrete road work, 2nd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny 5 Completed EE PRED, Bangalore 5 0
2012-13 79 Cement concrete road work, 3rd cross, Ganesha Layout, MS Palya, Bangalore North MP constituecny 5 Completed EE PRED, Bangalore 5 0
2012-13 80 Cement concrete road work, Mainroad, Ganesha Layout, MS Palya, Bangalore North MP constituecny 5 Completed EE PRED, Bangalore 5 0
2012-13 81 Borewell digging work for drinking water, BHEL layout welfare assocation, Rajarajeshwari Nagara Bangalore 2 Completed EE PRED, Bangalore 2 0
2012-13 82 water supplying work, Amrutha halli Mainroad to Shobha piper mart opposite, Byatarayanapura BBMP, Bangalore 2 Completed EE PRED, Bangalore 2 0
2012-13 83 Community hall construction, Milk colony, 4th cross, ward no.66, 64, Bangalore north MP Constituency 13 Under Progress EE PRED, Bangalore 0 13
2012-13 84 Drilling Borewell at A-Sector Vinayaka Block Amrutha halli in ward No.7 Bangalore 2 completed EE PRED, Bangalore 2 0
2012-13 85 Gutter Concrete slab construction work, From Basavanna temple to Husanemar (Tamarin tree), Hampapura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore south Taluk 5 Completed EE PRED, Bangalore 5 0
2012-13 86 Road development work from, AK colony to Devegere village, Devagere village, K.Gollahalli village, Kengeri Hobli, Bangalore South talluk 3 Completed EE PRED, Bangalore 3 0
2012-13 87 Concrete road development work, from Ashwathkatte to Motamma home, Kenchanapalya village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore south Talluk 1 Under Progress EE PRED, Bangalore 0 1
2012-13 88 Road development work from Main road to Ankappa home, Kalkere village, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 89 Road development work Near Ashwath Katte, Vivekananda Nagara, Somashettihalli Gramapanchayath, Bangalore north Talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 90 2 borewell digging in Chokkanahalli colony and Chokkanahalli, Marenahalli Gramapanchayath, Jala Hobli 4 Completed EE PRED, Bangalore 4 0
2012-13 91 Building construction for councelling center and other activities, Mahila Dakshata samiti Bengaluru, 10 Completed Nirmithi Kendra 10 0
2012-13 92 Student hostel, Danashoora Kambi M. Siddaramanna, Nolamba Veerashaiva Sanhga ® 5 Completed EE PRED, Bangalore 5 0
2012-13 93 Gutter construction road, ST colony, Dinnepalya, Kaggalipura Gramapanchayath, Uttarahalli hobli, Bangalore south talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 94 PU college building work, Janasave trust, Channenahalli, Tavarekere hobli, Bangalore south talluk 10 Completed EE PRED, Bangalore 10 0
2012-13 95 1 Borewell digging, Vayunandana Layout, Bangalore north MP constituency 2 Completed EE PRED, Bangalore 2 0
2012-13 96 2 Borewell digging work, in Saptagiri Layout, Doddabidarakallu village 2 Completed EE PRED, Bangalore 2 0
2012-13 97 Concrete road work, Gadenahalli, Jala Hobli, Bangalore north Talluk 2.5 Completed EE PRED, Bangalore 2.5 0
2012-13 98 Concrete road work, Turahunase Village, Jala Hobli, Bangalore north Talluk 2.5 Under Progress EE PRED, Bangalore 0 2.5
2012-13 99 1 bore digging work, ward no.6, Thanisandra, Byatarayanapura Constituency, Bangalore 2 Completed EE PRED, Bangalore 2 0
2012-13 100 Road development work, Cross road, Brothers colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north tAlluk 5 Completed EE PRED, Bangalore 5 0
2012-13 101 Road development, Masjid road, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 102 Road developmentwork, from Mahalingam home to Ganganna home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 103 Road developmentwork, from Harish Home to Manohar home, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
2012-13 104 Road developmentwork,1st cross, Brother colony, Chikkabanavara, Yashwanthpura hobli, Bangalore north talluk 5 Completed EE PRED, Bangalore 5 0
    Total 505.54     482.04 23.5
2011-12 1 Emergisation of Borewell in Nandini Layout, Panimala Nagar, Bangalore 2 work completed EE PRED 2 0
2011-12 2 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 1st Cross 5 work completed EE PRED 5 0
2011-12 3 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 2nd Cross 5 work completed EE PRED 5 0
2011-12 4 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 3rd Cross 5 work completed EE PRED 5 0
2011-12 5 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 4th Cross 5 work completed EE PRED 5 0
2011-12 6 Bangalore North Talluk, Yashawanthapura Hobli, Ckikkabanavara village, Maruthi Nagara 5th Cross 5 work completed EE PRED 5 0
2011-12 7 Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village, Maruthi Nagara, Dwaraka Nagara Road development work 5 work completed EE PRED 5 0
2011-12 8 Maruthi Nagara subroad (cross) road Development work 5 work completed EE PRED 5 0
2011-12 9 Maruthi Nagara New Layout Road development work 5 work completed EE PRED 5 0
2011-12 10 Bangalore North Talluk, Yashawanthapura Hobli, Chikkabanavara village BET School Road Development 5 work completed EE PRED 5 0
2011-12 11 Road Development work 1 & 2nd road, from Hesaraghatta road to Dwarakanagara, Chikkabanavara village, Yashawanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 12 Road Development work, 1st Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 13 Road Development work, 2nd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 14 Road Development work, 3rd Cross, Sandhya Nagara, Yashawanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 15 Road development work 250-500, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli 5 work completed EE PRED 5 0
2011-12 16 Road development work 500-750, Kempapura, Maruthi Nagara, Bangalore North talluk, Yashawanthapura Hobli 5 work completed EE PRED 5 0
2011-12 17 Cement Concrete road construction work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North tAlluk 5 work completed EE PRED 5 0
2011-12 18 Cement concrete road construction work, near Ashwathkatte, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 19 Cement concrete road work, from Rajanna home to till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 20 Cement concrete road work, till Sangappa home, Lakshmipura village, Yashwanthapura village, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 21 Cement concrete road construction work, for Bipass road, Lakshmipura village, yashwanthpura hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 22 Borewell digging, Motor implementation & Getting power supply form KEB, M.Hosahalli village, 5 under progress EE PRED 2.5 2.5
2011-12 23 Borewell digging, Motor implementation & Getting power supply form KEB, Chokkanahalli village, Marenahalli Gramapanchayath, Jalahalli Hobli 5 under progress EE PRED 2.5 2.5
2011-12 24 Borewell digging, Motor implementation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli 5 under progress Taluk 2.5 2.5
2011-12 25 Borewell digging, Motor implementation & Getting power supply form KEB, Marasandra village, Marenahalli Gramapanchayath, Jalahalli Hobli 5 under progress EE PRED 2.5 2.5
2011-12 26 Road development work, Cross -1, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North 5 work completed EE PRED 5 0
2011-12 27 Road development work, Cross -2, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North Taluk 5 work completed EE PRED 5 0
2011-12 28 Road development work, Cross -3, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North Taluk 5 work completed EE PRED 5 0
2011-12 29 Road development work, Cross Roads, New Layout, Ganiganahalli village, Yashwanthpura village, Bangalore North Taluk 5 work completed EE PRED 5 0
2011-12 30 Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk 5 work completed EE PRED 5 0
2011-12 31 Road development work (0-100) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 32 Road development work (100-200) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 33 Road development work (200-300) form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 34 Road development work form Acharya collage road to Veerashettihalli road, Yashawanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 35 Road development work, Ganapathi nagara cross road, Yashwanthpura hobli, Bangalore North talluk 5 work completed EE PRED 5 0
2011-12 36 Road development work and asphalting work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road 2.5 work completed EE PRED 2.5 0
2011-12 37 Road development work and asphalting work 1st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road 2.5 work completed EE PRED 2.5 0
2011-12 38 Road development work and asphalting work 1st cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road 2.5 work completed EE PRED 2.5 0
2011-12 39 Road development work and asphalting work 2st cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road 2.5 work completed EE PRED 2.5 0
2011-12 40 Road development work and asphalting work 3rd cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road 2.5 work completed EE PRED 2.5 0
2011-12 41 Road development work and asphalting work 3rd cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road 2.5 work completed EE PRED 2.5 0
2011-12 42 Road development work and asphalting work 4th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road 2.5 work completed EE PRED 2.5 0
2011-12 43 Road development work and asphalting work 4th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road 2.5 work completed EE PRED 2.5 0
2011-12 44 Road development work and asphalting work 5th cross stage 1, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road 2.5 work completed EE PRED 2.5 0
2011-12 45 Road development work and asphalting work 5th cross stage 2, Bangalore North Talluk, Kalkaere village, NRI layout, Sundaranjaneya temple layout road 2.5 work completed EE PRED 2.5 0
2011-12 46 Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division. 5 work completed EE PRED 5 0
2011-12 47 Drilling of Borewell of fixing submersible pumpset, with end connection at Appanappa layout in ward No. 72 of herohalli sub division. 5 work completed EE PRED 5 0
2011-12 48 Drilling of Borewell of fixing submersible pumpset, with end connection at andrahalli in ward no 40 of Herohalli sub division, bangalore south taluk 5 work completed EE PRED 5 0
2011-12 49 Drilling of Borewell of fixing submersible pumpset, with end connection at maranna layout, near muneshwara temple in ward No. 40 of Herohalli subdivision, , bangalore south taluk 5 work completed EE PRED 5 0
2011-12 50 Compound construction work (stage-1) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk 5 work completed EE PRED 5 0
2011-12 51 Compound construction work (stage-2) sy.no.53, south and west side of graveyard, Todigehalli village, Kodigehalli Grama panchayath, Yashawanthapura Hobli, Bangalore north tAlluk 5 work completed EE PRED 5 0
2011-12 52 Gutter construction work, from Acharappa home to Mahimaraju home, K.Gollahalli Village, Kengeri Hobli 3 work completed EE PRED 3 0
2011-12 53 Road development work from Gudimavu main road to Devagere Harijana Colony, K.Gollahalli Gramapanchayath village, Bangalore south talluk 4.25 work completed EE PRED 4.25 0
2011-12 54 Road development work form Kenchanapalya village to Paadri colony, K.Gollahalli Gramapanchayath, Bangalore South Talluk 1.5 work completed EE PRED 1.5 0
2011-12 55 Pipeline implementation and Getting power supply from KEB, Maralukunte village, Marenahalli Gramapanchayath, Jala Hobli 5 work completed EE PRED 5 0
2011-12 56 Road Development work from H.Gollahalli main road to Kabbalamma Temple, K.gollahalli Gramapanchayath, Kengeri Hobli, Bangalore South Talluk 5 work completed EE PRED 5 0
2011-12 57 Library construction, Gonipura vilage, Yashawanthapura limits 5 work completed EE PRED 5 0
2011-12 58 Women empowerment Building work (streeshakti bhavana) Gonipura village, Yashawanthapura limits 5 work completed EE PRED 5 0
2011-12 59 Gutter construction work from Mallappa home to Narayanaswamy home, Hampapur village, K.Gollahalli Gramapanchayath, Bangalore South Talluk 4 work completed EE PRED 4 0
2011-12 60 Improvement and Asphalting to roads in sonnappa layout at bhuvaneshwari nagar Hebbal Kempapura, Bangalore 4th cross, stage -2. 4 work completed EE PRED 4 0
2011-12 61 Improvement of Asphalting to roads in sonnappa layout at bhuvanushwarinagar Hebbal Kempapura, Bangalore 5th cross, stage -2. 4 work completed EE PRED 4 0
2011-12 62 Formation and metalling the roads of siddappa layout 1st cross, K.R.puram hobli Bangalore North Parlimentary Constituency 2.5 work completed EE PRED 2.5 0
2011-12 63 Formation and metalling the roads of siddappa layout 2st cross, K.R.puramhobli Bangalore North Parlimentary Constituency 2.5 work completed EE PRED 2.5 0
2011-12 64 Formation and metalling the roads of Motappa Layout 1st cross, K.R. Puram hobli, Bangalore north, Parliamentary constituency. 2.5 work completed EE PRED 2.5 0
2011-12 65 Formation and metalling the roads of Motappa Layout 2st cross, KR Puram hobli, Bangalore north, Parliamentary constituency. 2.5 work completed EE PRED 2.5 0
2011-12 66 Formation and metalling the roads of Motappa Layout 3rd cross, KR Puram hobli, Bangalore north, Parliamentary constituency. 2.5 work completed EE PRED 2.5 0
2011-12 67 Formation and metalling the roads of Motappa Layout 4th cross, KR Puram hobli, Bangalore north, Parliamentary constituency. 2.5 work completed EE PRED 2.5 0
2011-12 68 Chainlink Compund construction work, ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 69 Concrete road development work, Beside ChikkaBanavara Govt high School, yashawanthapura hobli, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 70 Primary School Building construction, Gonipura village, K.Gollahalli Gramapanchayath, Kengeri hobli, Bangalore South Talluk 4 work completed EE PRED 4 0
2011-12 71 Fixing of 24 LED lights of 1.8D AC Luminor of 109 numbers inward No. 22 Ganganagar, Bangalore North 18.62 work completed Nirmithi Kendra 18.62 0
2011-12 72 Community hall construction work Stage -1, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village. 5 work completed EE PRED 5 0
2011-12 73 Community hall construction work Stage -2, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village. 5 work completed EE PRED 5 0
2011-12 74 Community hall construction work Stage -3, Near Pattalamma temple, Kaggali pura village, Uttarahalli Hobli, Bangalore South Village. 5 work completed EE PRED 5 0
2011-12 75 Road Development work, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk 5 work completed EE PRED 5 0
2011-12 76 Road Development work Stage-1, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk 5 work completed EE PRED 5 0
2011-12 77 Road Development work Stage-2, Tirumalapura, Yashawanthapura hobli, Bangalore North talluk 5 work completed EE PRED 5 0
2011-12 78 Road development work, Anjeneya temple road, Veerashettihalli village, Yashawanthpura hobli, Bangalore North talluk 5 work completed EE PRED 5 0
2011-12 79 Road Development work, 1 & 2nd cross, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 80 Gutter Work, From chikkaBanavara to Kempapura Road, Yashwanthpura hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 81 Gutter work, From Dwarakanagara Cross to Kodohalla, Yashwanthpura hobli, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 82 Road Development work, New layout, Maruthi Nagar, Yashwanthpur hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 83 Concret road work, from Dasappanapalya main road to Kereguddadahalli, Bangalore north talluk 5 work completed EE PRED 5 0
2011-12 84 Concrete road work from Chowdeshwari layotu borewell to mini water tank, Kereguddadahalli, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 85 Road development work and asphalting work Stage – 1, Siddappa layout, Kalkere village, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 86 Road development work and asphalting work Stage – 2, Siddappa layout, Kalkere village, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 87 Road development work and asphalting work Stage – 1, Kariyappa Layout, Kalkere village, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 88 Road development work and asphalting work Stage – 2, Kariyappa Layout, Kalkere village, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 89 Road development work and asphalting work Stage – 1, Motappa ayout, Kalkere village, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 90 Road development work and asphalting work Stage – 2, Motappa ayout, Kalkere village, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 91 Formation of concrete road near Sri. Anjaneya Swamy temple, Tippur village, K.gollahalli village panchayat, Kengeri Hobli Bangalore south Taluk, Bangalore Stage-1 5 work completed EE PRED 5 0
2011-12 92 Formation of concrete road Development near Sri.Anjaneya swamy temple, Tippur village K.gollahalli village panchyat, Kengeri Hobli Bangalore south taluk, Bangalore Stage 2 5 work completed EE PRED 5 0
2011-12 93 Formation of concrete rod development near sri.Anjaneya swamy temple Tippur village, K.Gollahalli village Panchayat, Kengeri Hobli, Bangalore south taluk, Bangalore Stage 3 5 work completed EE PRED 5 0
2011-12 94 Road development work, Muneshwara Layout, Kalkere Village, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 95 Road development work, 2nd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 96 Road development work, 3rd cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 97 Road development work, 4th cross, Muneshwara Layout, Kalkere village, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 98 Road development work 0 – 250, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 99 Road development work 250-500, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 100 Road development work 500 – 750, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 101 Road development work 750-1000, from Vanirashi channasandra Mainroad to NRI Layout, Bangalore north Talluk 2.5 work completed EE PRED 2.5 0
2011-12 102 Rock Guttor construction, Maruthi Mainroad, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 103 Rock Guttor construction, Brothers colony, Chikkabanavara, Yashwanthpura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 104 Concrete road development work, Tirumalapura Village, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 105 Development work in New Layout, Banapathi nagara, GanigaraHalli village, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 106 5th Concrete Road Development work, Maruthi Nagara, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 107 Concrete road development work, 6th cross, Gulbarga Slum, Newlayout, Ganigarahalli, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 109 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (0.00 mts to250 mts) 2.5 work completed EE PRED 2.5 0
2011-12 110 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (250mts to 500 mts) 2.5 work completed EE PRED 2.5 0
2011-12 111 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (500mts to 750 mts) 2.5 work completed EE PRED 2.5 0
2011-12 112 Formation and metalling the roads from varanasi channasandra main road to maragondanahalli village limits in ward no.54, Bangalore North Taluk, Bangalore Urban District (750mts to 1000 mts) 2.5 work completed EE PRED 2.5 0
2011-12 113 Improvement and metalling the road in sunny layout 1st cross in ward No. 54, Bangalore North. 2.5 work completed EE PRED 2.5 0
2011-12 114 Improvement and metalling the road in sunny layout 2st cross in ward No. 54, Bangalore North. 2.5 work completed EE PRED 2.5 0
2011-12 115 Improvement and metalling the road in sunny layout 3st cross in ward No. 54, Bangalore North. 2.5 work completed EE PRED 2.5 0
2011-12 116 Improvement and metalling the road in sunny layout 4st cross in ward No. 54, Bangalore North. 2.5 work completed EE PRED 2.5 0
2011-12 117 Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 1 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs) 2.5 work completed EE PRED 2.5 0
2011-12 118 Improvement and metalling the roads from channasandra main road to NRI layout, in ward no.26, 2nd main, 2 st cross, Bangalore North Taluk, (0.00 mts to 250 mtrs) 2.5 work completed EE PRED 2.5 0
2011-12 119 Improvement and metalling of roads at 1st cross Udaya layout, Kodige halli, Yeshwanthpura Hobli, Bangalore north taluk, Bangalore Urban district. 5 work completed EE PRED 5 0
2011-12 120 Improvement and metalling of roads at 2nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district. 5 work completed EE PRED 5 0
2011-12 121 Improvement and metalling of roads at 3nd cross, srirama layout, Kodige halli, Yeshwanthapura Hobli, Bangalore North Taluk, Bangalore Urban district. 5 work completed EE PRED 5 0
2011-12 122 Road development work (tar), 8-9 & 14th Main road, Maruthi Nagara, Byatarayanapura, Bangalore South Talluk 13 work completed EE PRED 13 0
2011-12 123 Road development work, 1st cross, Ganesha Layout, Bangalore Talluk 5 work completed EE PRED 5 0
2011-12 124 Road development work, 2nd cross, Ganesha Layout, Bangalore Talluk 5 work completed EE PRED 5 0
2011-12 125 Road development work from 1 stage to 2nd stage Bhavani Layout, Tirumalapura Village, Yashwanthpura hobli, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 126 Concrete road development work, Lakshmipura village, Yashwanthpura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 127 Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 128 Road development work, From Hesaraghatta road to Kengal Hanumantayya nagara mainroad, Yashwanthpura Hobli, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 129 4 Rooms construction work, 1st floor, Govt Higher Primary School, Chikkabanavara village 22.5 work completed EE PRED 22.5 0
2011-12 130 To impliment Pump Tank and Tap to Borewell in Amruth Nagar Layout 2 work completed EE PRED 2 0
2011-12 131 To dig Borewel in Amrutha Nagar 2 work completed EE PRED 2 0
2011-12 132 Construction of Ladies Hostel building complex at site No. 22, Kasturinagara Bangalore 10 work completed KRIDL 10 0
2011-12 133 Community Hall construction, Near BDA Park, Opposite VaiyalliKaval education trust, Bangalore north MP constituency 10 work completed EE PRED 10 0
2011-12 134 Road development work form Kempapura mainroad to Gangadharappa home, Chikkabanavara, Yashwanthpura Hobli, Bangalore north Talluk 5 work completed EE PRED 5 0
2011-12 135 Road development work from Basavaraju home to Nagaraju home, Kempapura Mainroad, ChikkaBanavara, Yashwanthpura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2011-12 136 Gutter work Stage – 2, Gonipura village, K.Gollahalli Gramapanchayath, Kengere hobli, Bangalore South Talluk 5 work completed EE PRED 5 0
2011-12 137 Concrete road construction work, 4th A, B, & C corss, ward no. 102, Vrushabhavathi Nagara, Vinayakanagara 10 work completed EE PRED 10 0
2011-12 138 2 % Administration expinditure 10   DC 10 0
    Total 624.87     614.87 10
2010-11 1 Concrete road construction work Stage -1, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli, 5 work completed EE PRED 5 0
2010-11 2 Concrete road construction work Stage -2, from Kalakele Veerabhadraswamy Temple Malamma muniyappa home, Bangalore East Talluk, K.R pura Hobli, 5 work completed EE PRED 5 0
2010-11 3 Road development work Stage – 1, Malurappa mane, K.R. Pura Hobli 5 work completed EE PRED 5 0
2010-11 4 Road development work Stage – 2, Malurappa mane, K.R. Pura Hobli 5 work completed EE PRED 5 0
2010-11 5 Road development work from Doddagollarahalli Banian tree road to Pipeline road, Magadi mainroad, Yashwanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2010-11 6 Road Development work, from Doddagollarahatti Pipeline road to Govt Primary school, Yashavantapura Hobli 5 work completed EE PRED 5 0
2010-11 7 Concrete Road construction work for all the (cross) subroads, Doddagollarahatti village, Yashavanthapura Hobli 5 work completed EE PRED 5 0
2010-11 8 Culvert and Road development work for Doddagollarahatti (cross roads) Subroads, Yashavanthapura hobli 5 work completed EE PRED 5 0
2010-11 9 Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.00 mt to 613.00 mt) 5 work completed EE PRED 5 0
2010-11 10 Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 0.613mt to 1226.00 mt) 5 work completed EE PRED 5 0
2010-11 11 Improvement and Metalling to the road from CTR Road, to Rakhum school at Bettenahalli in bettahalasur gram Panchayat, Jala Hobli, Bangalore North, Bangalore Urban district (Ch. 1226 mt to 1839.00 mt) 5 work completed EE PRED 5 0
2010-11 12 Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1000 mt to 1613.00 mt) 5 work completed EE PRED 5 0
2010-11 13 Improvement and Metalling to the road from Tharahunase to bettenahalli village, bettahalsur gram panchyath, Jala Hobli, Bangalore north, Bangalore urban district (Ch. 1613 mt to 2226.00 mt) 5 work completed EE PRED 5 0
2010-11 14 Road development work Stage – 1 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5 work completed EE PRED 5 0
2010-11 15 Road development work Stage – 2 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5 work completed EE PRED 5 0
2010-11 16 Road development work Stage – 3 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5 work completed EE PRED 5 0
2010-11 17 Road development work Stage – 4 for Ganapathi nagara, Chikkabanavara village, Yashavanthapura Hobli 5 work completed EE PRED 5 0
2010-11 18 Road construction work, MM Road, Chikkabanavara, Yashawanthapura Hobli 5 work completed EE PRED 5 0
2010-11 19 Road Construction work Stage – 1, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5 work completed EE PRED 5 0
2010-11 20 Road Construction work Stage – 2, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5 work completed EE PRED 5 0
2010-11 21 Road Construction work Stage – 3, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5 work completed EE PRED 5 0
2010-11 22 Road Construction work Stage – 4, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5 work completed EE PRED 5 0
2010-11 23 Road Construction work Stage – 5, Janatha Colony, Chikkabanavara village, YashawanthaPura Hobli 5 work completed EE PRED 5 0
2010-11 24 Construction of sky light roofing for the park at Kethamaranahalli in Rajajinagar 1st Block, Bangalore North Parlimentary constituency, Bangalore. 8 work completed EE PRED 8 0
2010-11 25 One Borewell in Mailanahalli Village, Jala Hobli, Bangalore North Talluk 1.5 work completed EE PRED 1.5 0
2010-11 26 Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk, 0.00 to 98 mts (left side) 5 work completed EE PRED 5 0
2010-11 27 Construction of RCC deck slab & RCC drain at Maruthinagar, Chikkabanavara gram panchayat, Yeshvanthapura Hobli, Bangalore North Taluk – from Chainage 98.00 to 196.00 (left side) 5 work completed EE PRED 5 0
2010-11 28 Borewell digging work, Bagalahalli village, Marenahalli Gramapanchayath, Jala Hobli, Bangalore North Talluk 1.5 work completed EE PRED 1.5 0
2010-11 29 Devasandra Main road Auto stand, Venkateshwara Theater Road, Eashwar Temple, Sri Sai clinic 8th main, 9th main, 5th main, 2nd main, Hasarat Masid, K.R. Puram assembly constituency ( 6 Nos Solar street Lights) 4.41 work completed Nirmithi Kendra 4.41 0
2010-11 30 Rajareshwari Temple, Sri Durga Mahewaramma Temple , Ganesh Temple main circle, K.R.Puram assembly constituency (6 Nos solar street Lights) 4.41 work completed Nirmithi Kendra 4.41 0
2010-11 31 K.R Puram Govt Hospital vegetable market, K.R.puram assembly constituency ( 6 No’s solar street lights) 4.41 work completed Nirmithi Kendra 4.41 0
2010-11 32 K.R Puram Bus stand, K.R.puram railway station front gate K.R. puram assembly contituency ( 6 No’s solar street lights) 4.41 work completed Nirmithi Kendra 4.41 0
2010-11 33 Sri Varasiddi vinayaka Temple, Yellamma Temple, Ayyappa swamy Temple, Vinayaka Temple, medahalli Badavane main road, K.R. puram assembly contituency ( 6 No’s solar street lights) 4.41 work completed Nirmithi Kendra 4.41 0
               
2010-11 34 Medahalli Badavane 2nd Cross, 3rd cross, Sri. Sai layout 1st cross, 2nd cross, 3rd cross, K.R.Puram assembly contituency ( 6 Nos solar street lights) 4.41 work completed Nirmithi Kendra 4.41 0
2010-11 35 Ramamandhir 1st cross, Segehalli ward No.53, K.R. Puram assembly contituency ( 6 No’s solar street lights) 4.41 work completed Nirmithi Kendra 4.41 0
2010-11 36 Ganesh Temple 4th cross, 2nd cross, Govt Hospital Near Bus stop, Eshwar Temple Maremma Temple, Yellamma Temple, Byatarayanapura assembly constituency ( 6 No’s solar street lights) 4.41 work completed Nirmithi Kendra 4.41 0
2010-11 37 Dasarahalli main road, Byatarayanapura assembly constituency. (6 No’s solar street lights) 4.41 work completed Nirmithi Kendra 4.41 0
2010-11 38 Saraswathipura Main road, Byatarayanapura assembly constituency (6 No’s solar street lights) 4.41 work completed Nirmithi Kendra 4.41 0
2010-11 39 Anjeneya swamy temple M. Bagarappa L/O, Hoysala L/O, Byatranapura assembly constituency (6 No’s solar street lights) 4.41 work completed Nirmithi Kendra 4.41 0
2010-11 40 R.T. Nagar main road, Hebbal assembly constituency (2 No’s solar street lights) 1.47 work completed Nirmithi Kendra 1.47 0
2010-11 41 Borewell work, for Drinking water to Parimala Nagara, Nandini Layout, Mahalakshipuram ward no. 43 1.5 work completed EE PRED 1.5 0
2010-11 42 Oldage Home building construction work, Sy no.113, Shree Shankara Balaga, New Park road, Malleshwaram, Bangalore 1 work completed EE PRED 1 0
2010-11 43 Road Development work Stage – 1, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2010-11 44 Road Development work Stage – 2, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2010-11 45 Road Development work Stage – 3, Lake Behind Road, Ganigara village, Yashawanthapura Hobli, Bangalore North Talluk 5 work completed EE PRED 5 0
2010-11 46 Road Development work, from Kempapura Maruthi Nagara Mainroad, Bangalore North Talluk 5 work completed EE PRED 5 0
    Total 208.48     208.48 0
2009-10 1 Providing cement concerte payment from Bandrappa’s house to samashitti halli Road at Kenigadda halli village, Bangalore North Taluk, Bangalore Dist. 4.5 work completed EE, PRED, Bangalore 4.5 0
2009-10 2 Construction of RCC Drain from Kiveguddahalli Village, to Banmddappa’s Garden at Bangalore North Taluk, Bangalore District. 7.99 work completed EE, PRED, Bangalore 7.99 0
2009-10 3 Providing concerte Road at Ganigarahalli Village, Samashutty halli Grama Panchayath, Bangalore North Taluk, Bangalore District. 8 work completed EE, PRED, Bangalore 8 0
2009-10 4 Improvements to Bangalore Mittaganahalli road in Jala Hobli, Bangalore North Taluk, Bangalore Urban Dist. 8 work completed EE, PRED, Bangalore 8 0
2009-10 5 Providing concerete to roadrata chandranagar, Kuvempu Road, Kamalanagar in Mahalakshmi puram, Bangalore North, Bangalore Dist 8 work completed EE, PRED, Bangalore 8 0
2009-10 6 Cement concrete road construstion work stage -1, Hosahalli village, Jaalahalli Hoobli, Bangalore North Talluk 8 work completed EE, PRED, Bangalore 8 0
2009-10 7 Cement concrete road construction work, Kodagalahatti Village, Jalahalli Hobli 8 work completed EE, PRED, Bangalore 8 0
2009-10 8 Road Development work, from Tarahunase to Bettenahalli village joining road, Jaalahalli Hobli 10 work completed EE, PRED, Bangalore 10 0
2009-10 9 Road Development work, Marenahalli Joining road, Jaalahalli Hobli 4 work completed EE, PRED, Bangalore 4 0
2009-10 10 Providing cement concrete road at 17th ward, 4th Cross, Vrushashavti Nagar,N.G.O colony, Bangalore. ( Stage 1) 3.49 work completed EE, PRED, Bangalore 3.49 0
2009-10 11 Providing cement concrete road at 17th ward, 3rd main road, Vrushabhavatinagar, NGO colony, Bangalore. (Stage 2) 7.1 work completed EE, PRED, Bangalore 7.1 0
2009-10 12 Cement concrete road and Gutter construction work from Narayanappa home to Munimuttapa home and ChikkaKempanna home to Doddayya home, Jaagalatti village, Jaalahalli hoobli 8 work completed EE, PRED, Bangalore 8 0
2009-10 13 Community hall construction for Margadarshi Mahila Samaja ® , No.114, 6th Cross, Narasipura layout, Vidyaranyapura, Bangalore 1 work completed Project Manager, Nirmithi Kendra Urban 1 0
2009-10 14 Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District. 5 work completed EE, PRED, Bangalore 5 0
2009-10 15 Construction of Size Stone masonery Drerinat first main road near School in kamala nagar, Bangalore urban District. 5 work completed EE, PRED, Bangalore 5 0
2009-10 16 Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 1 8 work completed EE, PRED, Bangalore 8 0
2009-10 17 Improvement of ashalt to roadr swaranappa layout at Bhuvanshwara ngar Hebbal Kempapura, Bangalore, 4th and 5th Cross, Stage 2nd 8 work completed EE, PRED, Bangalore 8 0
2009-10 18 Concrete Road construction work from Narasimhamurthy home to Philomina School, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No.72, Bangalore North, Yashwanthpur MLA constituency 8 work completed EE, PRED, Bangalore 8 0
2009-10 19 Cement Concrete road construction work form Rangaswamy home to Muneshwara Temple, Nanjappa Layout, Vighneshwara Nagara, Herohalli, Bangalore North Talluk, Yashwanthpura MLA constituency 8 work completed EE, PRED, Bangalore 8 0
2009-10 20 Concrete Road Construction work from Shivalingayya home to Krishnaiah home, Nanjappa Layout, Vighneshwara Nagara, Herohalli, BBMP ward No. 72 8 work completed EE, PRED, Bangalore 8 0
2009-10 21 Concrete Road Construction work from Shankara Home to Muneshwara temple, Nanjappa Layout, Vighneshwara Nagara, Herohali, BBMP ward No.72 8 work completed EE, PRED, Bangalore 8 0
2009-10 22 Road development chain 0-500, from Vidya Nagara Main road to Hosahalli village side, Bangalore North Talluk 5 work completed EE, PRED, Bangalore 5 0
2009-10 23 Cement Concrete road from ChikkaBasavaraju Home to Bhimarav road, Uttanahalli Village, Bangalore North Talluk 5 work completed EE, PRED, Bangalore 5 0
2009-10 24 Cement Concrete Road from Venkobarao home to Anjanappa home, Sonnappanahalli Village, Bangalore North Talluk 5 work completed EE, PRED, Bangalore 5 0
2009-10 25 Cement Concrete Road from Rajanna Home to Sampangappa Home, Kadiganahalli Village 5 work completed EE, PRED, Bangalore 5 0
2009-10 26 Cement Concrete Road from Main road to Virajappa Home, Ukkenahalli village, Bangalore North Talluk 5 work completed EE, PRED, Bangalore 5 0
2009-10 27 Cement Concrete road from Muniraju home to Krishnappa home, Uttanahalli Village, Bangalore North Talluk 5 work completed EE, PRED, Bangalore 5 0
2009-10 28 Cement concrete road till Palakammanagara Home, Chikkajaga village, Bangalore North Talluk 5 work completed EE, PRED, Bangalore 5 0
2009-10 29 Road development work (500-1000 meter) Bangalore North Talluk, Vidyanagara, Bagaluru Mairn road to Hosahali village 5 work completed EE, PRED, Bangalore 5 0
2009-10 30 Cement concrete road behind Mutyalamma temple, Doddajaala, Bangalore North Talluk 5 work completed EE, PRED, Bangalore 5 0
    Total 189.08     189.08 0

Related Articles

Check what your MP has done: P C Mohan, Bangalore Central
Check what your MP has done: Ananth Kumar, Bangalore South

Support Citizen Matters - independent, Reader-funded media that covers your city like no other.DONATE
About News Desk 1223 Articles
The News Desk at Citizen Matters puts out Press Releases, notifications and curated information useful to the urban reader.