So, here’s the list of works done by H N Ananth Kumar using the MPLADS fund, in the last five years. We encourage and invite our readers to check the list and check whether the work has actually been done, if yes, quality of work, cost to quality ratio etc. You can comment below the article with your inputs.
Bangalore South MP, Ananth Kumar has spent around Rs. 17.75 crores of his MPLAD funds during the current Lok Sabha.
- Civic Amenities category tops the MPLAD funds utilisation with a total spending of Rs. 6.2 crores. Construction of community halls and cultural halls seems to be the flavour of the season.
- The MP has also spent over 4 crores on constructing school buildings, class rooms etc.
- Ananth Kumar seems to have fared reasonably better under the ‘Health’ category under which he has funded medical equipment for hospitals and health centres. The MPLAD utilisation under that category comes to around Rs. 1.8 crores.
- In terms of maximum number of projects, the MP has funded 111 water projects to the tune of Rs. 4.5 crores. A bulk of these projects are about sinking borewells, providing submersible pumps, water connections etc.
- The MP has also funded 5 sanitation projects ( construction of toilets) to the tune of Rs. 4 crores.
- Ananth Kumar has also funded 3 road improvement projects to the tune of Rs. 44 lakhs.
- The total number of projects funded under the MPLAD scheme – 224.
The data shows the work done from 2009-10 to 2013-14, and shows even the works under progress.
Disclaimer:
1) The data has been obtained from Bangalore Urban Deputy Commissioner’s office. It has been presented here in its original shape, format and spellings.
2) Citizen Matters is not responsible for the errors if any, as the data has been produced in its original form, with minimum corrections.
Physical and Financial Progress on Implementation of MPLADS works in Bangalore (Urban) District |
|||||||
Year | No | Name & Location of the work |
Estimate |
Status | Executing Agency |
Expense incurred |
Balance If Any |
2013-14 | 1 | Construction of Yoga Meditation centre at Sri.Adichunchanagiri, Maha samsthana math, begur hobli, Hulimavu, Bommanahalli, Bangalore | 25 | under progress | Project Manager, Nirmithi Kendra Urban | 12.5 | 12.5 |
2013-14 | 2 | Providing lights with RCC frames and improvement of 18th main and 45th cross 4th ‘T’ block junction jayanagar bangalore-41 | 19.5 | under progress | EE, PRED, Bangalore | 0 | 19.5 |
2013-14 | 3 | Construction of cultural Hall @ Sree Brahma Chaitnya Mandira Trust, No, 1692, 16th Main, 5th Cross, BSK 1st Stage. 2nd Block, Ward No,163 Bangalore | 25 | under progress | EE, PRED, Bangalore | 0 | 25 |
2013-14 | 4 | Erection of Borewell and Energisation at ward No.155, KS Narashimha Swamy road, gavipuram village near sri Rama Mandira Gavipuram Bangalore | 2.5 | under progress | EE, PRED, Bangalore | 0 | 2.5 |
2013-14 | 5 | Construction of Hume water cistern providing pipeline | 2.5 | under progress | EE, PRED, Bangalore | 0 | 2.5 |
2013-14 | 8 | Construction of School Building @ ward NO 127, Panchasheela nagar BBMP School Moodalapalya Bangalore | 25 | under progress | Project Manager, Nirmithi Kendra Urban | 12.5 | 12.5 |
2013-14 | 9 | Construction of Class Rooms at patel gullappa High School No.1, Janana Kashi (55) Muneswara Block, Avalahalli, Mysore Road, Vijayanagar Constituency Bangalore | 10 | under progress | EE, PRED, Bangalore | 0 | 10 |
2013-14 | 10 | a) Ward No.161. Manjunatha Nagara Hosakerehalli Padmanabha Nagar Constituency Bangalore, Sinking of Borewell and Erection of cistern | 2.5 | under progress | EE, PRED, Bangalore | 0 | 2.5 |
2013-14 | 11 | b) Ward No.161 Manjunatha nagar , Hosakerehalli Padmanabhanagara Constituency Bangalore providing Pump, Motor with Electric facilities pipe line work | 2.5 | under progress | EE, PRED, Bangalore | 0 | 2.5 |
2013-14 | 12 | a) Erection of Borewell and Energisation and Construction of RCC Humepipe water cistern, providing pipeline @ ward No 127, mudalapalya near Bathilingeswara temple Bangalore | 5 | under progress | EE, PRED, Bangalore | 0 | 5 |
2013-14 | 13 | b) Erection of Borewell and Energisation and Construction of RCC Humepipe water cistern, providing pipeline @ ward No 128 coconut garden Main road Govindarajanagar Constituency Bangalore | 5 | under progress | EE, PRED, Bangalore | 0 | 5 |
2013-14 | 14 | c) Erection of Borewell and Energisation and Construction of RCC Humepipe water cistern, providing pipeline @ ward No 128 Nagarabhavi arundathi nagar 5th Cross Govindarajanagar Constituency Bangalore | 5 | under progress | EE, PRED, Bangalore | 0 | 5 |
2013-14 | 15 | a) Ward No.127, Moodalapalya 12th Cross, panchasheela Nagar, Govindaraja Nagar, Constituency Bangalore Sinking of Borewell Erection of Cistren | 2.5 | under progress | EE, PRED, Bangalore | 0 | 2.5 |
2013-14 | 16 | b) Ward No .127, Moodalapalya 12th Cross , Panchasheel Nagar, Govindaraja Nagar Constituency Bangalore, providing Pump Motor with Electrict fecilities & pipe Line works | 2.5 | under progress | EE, PRED, Bangalore | 0 | 2.5 |
2013-14 | 17 | c) Ward No.127, Moodalapalya 4th Main panchasheela Nagar, Govindarajanagar Constituency Bangalore Sinking Borewell and Erection of Cistren | 2.5 | under progress | EE, PRED, Bangalore | 0 | 2.5 |
2013-14 | 18 | d) Ward No. 127, Moodalapalya 4th Main, Panchasheela nagar. Govindarajanagar Constituency Bangalore Providing Pump Motor with electric facilities and pipe line works | 2.5 | under progress | EE, PRED, Bangalore | 0 | 2.5 |
2013-14 | 19 | a) Ward No 127, Moodalapalya 6th Cross Bathilingeshwara Layout, Govindarajanagar Constituency Bangalore sinking of borewell and Erection of cistern | 2.5 | under progress | EE, PRED, Bangalore | 0 | 2.5 |
2013-14 | 20 | b) Ward No.127, Moodalapalya 6th Cross, Bathilingeshwara layout govindarajanagara constituency bangalore providing pump motor with electric facilities and pipe line work | 2.5 | under progress | EE, PRED, Bangalore | 0 | 2.5 |
2013-14 | 22 | Construction of unique cultural centre @ centre for indian music experience (IME) MLR convention centre brigade millennium enclave J.P. Nagar 7th Phase Bangalore | 25 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 25 |
2013-14 | 24 | Procurement of Scanning Machine for N R Colony Maternity Home @ N R Colony, Basavana gudi, Bangalore 560019 | 10 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 10 |
2013-14 | 25 | Erection of 1 Borewell & Energisation & Construction of ECC hume Pipe water ciestern at Karnataka Padmashali Sangha # 7/1, N.R.Road 2nd Cross Padmashali Hostel Road, Kalasipalya, Bangalore | 2.5 | under progress | EE, PRED, Bangalore | 0 | 2.5 |
2013-14 | 26 | Erection of Borewell and Energisation and Construction of RCC Hume Pipe water cistern at 9th Cross, Kempapura Agrahara ward No.122 Magadi Road , Bangalore | 5 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 5 |
2013-14 | 27 | Erection of Borewell & Energisation & Construction of RCC Hume Pipe water Cistren at 12th Cross, Kempapura Agrahara Ward No.122, Magadi Road, Bangalore | 5 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 5 |
2013-14 | 28 | Erection of Borewell and energisation and electrification providing pipeline @ 9 Wards of Bommanahalli Constituency Bagnalore | 20 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 20 |
2013-14 | 29 | Development works at Govrernment Schools of 9 Wards of Bommanahalli Constituency Bangalore | 15 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 15 |
2013-14 | 30 | Development works of 9 wards of Bommanahalli Constituency Bangalore | 15 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 15 |
2013-14 | 31 | Erection of Borewell and Energisation and Construction of RCC Hume pipe water cistren providing Pipeline @ 5th Main, 6th Cross, Bapujinagara ward no 134, Bangalore | 5 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 5 |
2013-14 | 32 | Construction of Cultural Hall @ K.S.R.P quarters Koramangala Bangalore | 15 | under progress | EE, PRED, Bangalore | 0 | 15 |
2013-14 | 33 | Additional Amount towards construction of Toilet Blocks @ Govt Primary and High School, Byatarayanapura, Mysore Road, Bangalore, Vijayanagara | 3.98 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 3.98 |
2013-14 | 34 | To Provide pure Drinking water unit @ ward No.133 Hampinagara (R.P.C.Layout) Bangalore | 20 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 20 |
2013-14 | 35 | Construction of Class Rooms at Government Primary School, Jaraganahalli, Bommanahalli | 10 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 10 |
2013-14 | 36 | Consturction of Hostel Building at Karnataka Dophen Children Development Management 5th Cross, Chamundinagara, Sri. Sundara Mahal Road, BSK 3rd Stage Bangalore | 25 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 25 |
2013-14 | 37 | Additional Amt towards construction of Class Rooms @ Govt Pre-University College Bytarayana pura, Mysore Road, Bangalore | 3.81 | under progress | Project Manager, Nirmithi Kendra Urban | 0 | 3.81 |
399.79 | 37.5 | 362.29 | |||||
2012-2013 | 1 | Construction of Kala Bhavan at sri jayarama seva mandali, no.492/A, Sri jayarama seva mandali road, 1st main 8th block, jayanagar, B’lore-70 | 16.5 | Completed | Project Manager, Nirmithi Kendra Urban | 16.5 | 0 |
2012-2013 | 2 | Erection of Borewells & Energisation at Srinivaguly kaveramma temple street, Ejipura, ward no.148, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 3 | Erection of Borewells & Energisation at 20th main Srinivaguly Yellamma street, ward no.148, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 4 | Erection of Borewells & Energisation at 27th main Ejipura, ward no.148, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 5 | Erection of Borewells & Energisation at 20th cross, Bhajana Mandira, Ejipura, ward no.148, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 6 | Erection of Borewells & Energisation at 9th cross, 1st main, venkatapura, jakkasandra ward no.173, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 7 | Erection of Borewells & Energisation at 8th cross, 7th main, venkatapura, jakkasandra ward no.173, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 8 | Erection of Borewells & Energisation at 8th cross, 3rd main, venkatapura, jakkasandra ward no.173, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 9 | Erection of Borewells & Energisation at 5th main, Teacher colony, jakkasandra ward no.173, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 10 | Erection of Borewells & Energisation at 1st main, venkatapura, jakkasandra ward no.173, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 11 | Erection of Borewells & Energisation at 5th main, venkatapura, jakkasandra ward no.173, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 12 | Erection of Borewells & Energisation at 7th cross, Rajendra nagar slum, ward no.147, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 13 | Erection of Borewells & Energisation at 2nd main 6th cross, Rajendra nagar slum, ward no.147, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2012-2013 | 14 | Construction of Classrooms at Vijaya Bharathi Vidyalaya, No.570, 2nd Phase, Girinagar, Bangalore -85 | 25 | Completed | EE, PRED, Bangalore | 25 | 0 |
2012-2013 | 15 | Construction of Yoga Hall at vidanta mar vagini temple no.537, 22nd cross, 9th Main, BSK 2nd Stage, Bangalore 56070 | 25 | Completed | Project Manager, Nirmithi Kendra Urban | 25 | 0 |
2012-2013 | 16 | Construction of Classrooms at Adarsha vanitha samaja no.244/D, 32nd cross, 7th block jayanagar, Bangalore | 14.5 | work progress | Project Manager, Nirmithi Kendra Urban | 7.25 | 7.25 |
2012-2013 | 17 | For rain water harvesting & construction of Toilet Blocks at NMKRV womens College 3rd block, Jayanagar, Bangalore | 10 | Completed | Project Manager, Nirmithi Kendra Urban | 10 | 0 |
2012-2013 | 18 | Erection of 4 borewells & energisation & construction of RCC hume pipe water eiestero at ward no.133, hampinagar, RPC Layout Bangalore | 20 | Completed | EE, PRED, Bangalore | 20 | 0 |
2012-2013 | 19 | Erection of 4 borewells & energisation & construction of RCC hume pipe water eiestero at ward no.123, Vijayanagar, Bangalore | 25 | Completed | EE, PRED, Bangalore | 25 | 0 |
2012-2013 | 20 | Construction of Library Building at 2nd floor, madirala machideva temple, Kempanbudhi lake, Kempegowda nagar, Bangalore | 14.75 | under progress | Project Manager, Nirmithi Kendra Urban | 7.38 | 7.37 |
2012-2013 | 21 | Construction of 4 classrooms at govt. high school, Yediyur, Bangalore | 10 | under progress | Project Manager, Nirmithi Kendra Urban | 5 | 5 |
2012-2013 | 22 | Erection of 4 borewells & energisation & construction of RCC hume pipe water eiestero at ward no.183, chikkalasandra, padmanabhanagar, Bangalore | 20 | Completed | EE, PRED, Bangalore | 20 | 0 |
2012-2013 | 23 | Additional amount towards the construction of cultural hall at Sri.Rama Bhajana mandira, 6th block, Jayanagar, Yadiyur, ward, Bangalore | 15 | Completed | EE, PRED, Bangalore | 15 | 0 |
2012-2013 | 24 | Construction of cultural hall at CA site no.1(A) ward no.164, Chennammanakere Achukatty, BSK 3rd Stage, Bangalore | 25 | under progress | Project Manager, Nirmithi Kendra Urban | 12.5 | 12.5 |
2012-2013 | 25 | Construction of Yoga & cultural hall at no.31/6 magadi main road, Behind saraswathi converntional hall, Bangalroe | 25 | under progress | Project Manager, Nirmithi Kendra Urban | 12.5 | 12.5 |
2012-2013 | 26 | Addl Amount towards the construction of Cultural Hall at Kashmir Hindu cultural welfare trust, NAL Layout (Behind sagar Hospital) Jayanagar 4th Block Bangalore | 15 | under progress | Project Manager, Nirmithi Kendra Urban | 7.5 | 7.5 |
2012-2013 | 27 | In ward no.124, 2nd cross hosahalli Vijayanagar Sinking of Borewell & Erection of Cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 28 | In ward no.124, 2nd cross hosahalli Vijayanagar Providing pumping motor with electric facilities & pipe line work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 29 | In ward no.124, 2nd cross Telecom layout Vijayanagar sinking of Borewell & Erection of Cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 30 | In ward no.124, 2nd cross Telecom layout Vijayanagar Providing pump motor with electric facilities pipe line work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 31 | In ward no.124, 12th cross Krishnappa layout Vijayanagar Sinking of Borewell & Erection of Cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 32 | In ward no.124, 12th cross Krishnappa layout Vijayanagar Providing pump motor with electric facilities pipe line work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 33 | In ward no.124, Gangappa garden near Madeshwara Temple, Vijayanagar Sinking of Borewell & Erection of Cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 34 | In ward no.124, Gangappa garden near Madeshwara Temple, Vijayanagar Providing pump motor with electric facilities pipe line work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 35 | In ward no.124, club road, Vijayanagar Sinking of Borewell & Erection cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 36 | In ward no.124, club road, Vijayanagar Providing pump motor with electric facilities pipe line work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 37 | In ward no.126, Anubhavanagar, Sinking of Borewell & Erection of cistern | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 38 | In ward no.126, Anubhavanagar, Providing pump motor with electric facilities pipe line work | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 39 | In ward no.126, Subhanna garden, Sinking Borewell & Erection of Cistern | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 40 | In ward no.126, Subhanna garden, Providing pump motor with electric facilities pipe line work | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 41 | In ward no.126, G.K.W Layout, Sinking of Borewell & Erection of cistern | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 42 | In ward no.126, G.K.W Layout, Providing pump motor with electric facilities pipe line work | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 43 | In ward no.126, Vinayanaka Layout Sinking of borewell & Erection of cistern | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 44 | In ward no.126, Vinayanaka Layout Providing pump motor with electric facilities pipe line work | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 45 | In ward no.126, MC Layout Sinking of borewell & Erection of cistern | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 46 | In ward no.126, MC Layout Providing pump motor with electric facilities pipe line work | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 47 | Improvement works to Govt. Engineering & Medical Boys hostel Building Vidyapeeta Hanumanth nagar, Behind police station Bangalore | 10 | under progress | Project Manager, Nirmithi Kendra Urban | 10 | 0 |
2012-2013 | 48 | Improvement works to Govt. R.C. Collage Boys Hostel Building, Banashankari Bangalore | 15 | under progress | Project Manager, Nirmithi Kendra Urban | 15 | 0 |
2012-2013 | 49 | Improvement works to Govt. Art.Collage Boys Hostel Building, Marenahalli Ring road, opp central Mall, 9th Block, Jayanagar, Bangalore | 15 | under progress | Project Manager, Nirmithi Kendra Urban | 15 | 0 |
2012-2013 | 50 | Ward no.148, Sriniragalu Indira Gandhi Slum, Near Sundari Memorial School, Sinking of Borewell & Erection of cistern | 2.5 | under progress | EE, PRED, Bangalore | 1.25 | 1.25 |
2012-2013 | 51 | Ward no.148, Sriniragalu Indira Gandhi Slum, Near Sundari Memorial School, Providing pump motor with Electric facilities & pipe line work | 2.5 | under progress | EE, PRED, Bangalore | 1.25 | 1.25 |
2012-2013 | 52 | Ward no.148, Sriniragalu A.K.Colony, near Aiyappa Swamy Temple, Sinking of Borewell & Erection of cistern | 2.5 | under progress | EE, PRED, Bangalore | 1.25 | 1.25 |
2012-2013 | 53 | Ward no.148, Sriniragalu A.K.Colony, near Aiyappa Swamy Temple, Providing pump motor with Electric facilities & pipe line work | 2.5 | under progress | EE, PRED, Bangalore | 1.25 | 1.25 |
2012-2013 | 54 | Addl. Amount towards the construction of Toilet block, sump, Tank, Pipeline & providing motor etc at Manonandana trust, No.1, 3rd main road near tata silk form KR road, Bangalore | 10 | under progress | Project Manager, Nirmithi Kendra Urban | 5 | 5 |
2012-2013 | 55 | Ward no.161, Hosakerehalli Manjunath Nagar, Ittumadu Sinking of Borewell & Erection of Cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 56 | Ward no.161, Hosakerehalli Manjunath Nagar, Ittumadu Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 57 | Ward no.161, HosakerehalliMukambika Nagar, Sinking of Borewell & Erection of Cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 58 | Ward no.161, Hosakerehalli Mukambika Nagar, Ittumadu Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 59 | Ward no.161, Hosakerehalli Eshwarinagar, Sinking of Borewell & Erection of Cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 60 | Ward no.161, Hosakerehalli Eshwari nagar, Ittumadu Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 61 | Ward no.161, Hosakerehalli Dattathreya Nagar, Sinking of Borewell & Erection of Cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 62 | Ward no.161, Hosakerehalli Dattathreya, Ittumadu Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 63 | Ward no.161, Hosakerehalli Anjaneya nagar, Sinking of Borewell & Erection of Cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 64 | Ward no.161, Hosakerehalli Anjaneya nagar Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 65 | In ward no.104, Govindaraj nagar 1st main MC Layout Sinking of Borewell & Erection of Cistern | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 66 | In ward no.104, Govindaraj nagar 1st main MC Layout Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 67 | In ward no.104, Govindaraj nagar 22nd cross, MC Layout Sinking of Borewell & Erection of Cistern | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 68 | In ward no.104, Govindaraj nagar 22nd cross, MC Layout Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 69 | In ward no.104, Govindaraj nagar 23rd cross, MC Layout Sinking of Borewell & Erection of Cistern | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 70 | In ward no.104, Govindaraj nagar 23rd cross MC Layout Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 71 | In ward no.104, Govindaraj nagar 1st main, 4th cross, MC Layout Sinking of Borewell & Erection of Cistern | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 72 | In ward no.104, Govindaraj nagar 1st main, 4th cross, MC Layout Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 73 | In ward no.104, Govindaraj nagar, Nagarabhavi Slum, Sinking of Borewell & Erection of Cistern | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 74 | In ward no.104, Govindaraj nagar Nagarabhavi Slum Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | Project Manager, Nirmithi Kendra Urban | 2.5 | 0 |
2012-2013 | 75 | In ward no.127, 2nd main, near saibaba temple, sanjeevini nagar, Moodalapalya Govindaraj nagar Bangalore, Sinking of Borewell & Erection of Cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 76 | In ward no.127, 2nd main, near saibaba temple, sanjeevini nagar, Moodalapalya Govindaraj nagar Bangalore, Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 77 | In ward no.127, 4th cross, sanjeevini nagar, Moodalapalya Govindaraj nagar Bangalore, Sinking of Borewell & Erection of Cistern | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
2012-2013 | 78 | In ward no.127, 4th cross, sanjeevini nagar, Moodalapalya Govindaraj nagar Bangalore, Providing Pump, Motor with Electric facilities & Pipeline work | 2.5 | Completed | EE, PRED, Bangalore | 2.5 | 0 |
Total | 490.75 | 428.63 | 62.12 | ||||
2011-2012 | 1 | BBMP Health Centre, Govindaraja Nagar, Prashanth Nagar Main Road, Bangalore | 5 | Completed | BBMP Bangalore. | 5 | 0 |
2011-2012 | 2 | BBMP Health Centre, Nayandahalli, Mysore Main Rod, Pantarapalya, Bangalore | 5 | Completed | BBMP Bangalore. | 5 | 0 |
2011-2012 | 3 | BBMP Health Centre, Tavarekere 1st main road, D R C Post, Bangalore | 5 | Completed | BBMP Bangalore. | 5 | 0 |
2011-2012 | 4 | BBMP Health Centre, J P Nagar 1st stage, Sarakki, Bangalore | 5 | Completed | BBMP Bangalore. | 5 | 0 |
2011-2012 | 5 | BBMP Health Centre, Vidyapeetha, Vidyapeeth circle, Shrinagar, Bangalore | 5 | Completed | BBMP Bangalore. | 5 | 0 |
2011-2012 | 6 | BBMP Health Centre, Chandra Layout, Gangondanahalli, Maka Masjid cross hospital, Bangalore | 5 | Completed | BBMP Bangalore. | 5 | 0 |
2011-2012 | 7 | Construction of Sabha Bhavan at gokkala Institute of Public Aja Bull Temple Road, NR colony Bangalore-19 | 15 | Completed | Project Manager, Nirmithi Kendra Urban | 15 | 0 |
2011-2012 | 8 | BBMP Health Centre, C T Bed 4th cross, Chanammakere, Banashankari 2nd stage, Neat S S M School, Bangalore | 5 | Completed | BBMP Bangalore. | 5 | 0 |
2011-2012 | 9 | BBMP Health Centre, Agara, H S R, Bangalore | 5 | Completed | BBMP Bangalore. | 5 | 0 |
2011-2012 | 10 | Construction of Multimedia hall at Sneha Bhavathi vidyalaya CA 14, 11th cross 5th main, hampinagar, Vijayanagar 2nd stage Bangalore560040 | 10 | Completed | EE, PRED, Bangalore | 10 | 0 |
2011-2012 | 11 | Constrcution of class rooms at Sri Sharada vidya peeta, M.Navasimhaiah layout Byalavayarapura mysore road, banglaore. | 10 | Completed | EE, PRED, Bangalore | 10 | 0 |
2011-2012 | 12 | Constrcution of class rooms at Sri vinayaka vidya samsthe 1st main Srinagar, banglaore. | 5 | Call for Estimate | EE, PRED, Bangalore | 0 | 5 |
2011-2012 | 13 | Construction of Samudaya Bhavan at Mayura vinayaka seva trust, No.6, 6th Bapuji nagar, Mysore Road bangalore-26 | 5 | completed | EE, PRED, Bangalore | 5 | 0 |
2011-2012 | 14 | Construction of Govt puc collage, building at No.31, sector-1 HSR layout bangalore-560102 | 25 | completed | EE, PRED, Bangalore | 25 | 0 |
2011-2012 | 15 | Rastrothara parishath yoga science & Ra at BBMP indoor Stading ward No.142, sankarahally bell Temple Road, Bangalore. | 25 | Completed | Project Manager, Nirmithi Kendra Urban | 25 | 0 |
2011-2012 | 16 | Erection of 3 Borewells & Energisation at ward No.178, 9th cross, venkatapura, 5th main Teachers colony 1st main, jakkasandra, Bangalore | 9 | work under progress | EE, PRED, Bangalore | 0 | 9 |
2011-2012 | 17 | Erection of Borewells & Energisation at ward No.128, 1st Stage, chandra layout, Ambedkar Nagar, Gangondanahalli | 10 | work under progress | EE, PRED, Bangalore | 5 | 5 |
2011-2012 | 18 | Erection of 3 Borewells & Energisation at ward No.105, Agrahara dasarahalli, Bangalore | 9.6 | work completed | EE, PRED, Bangalore | 9.6 | 0 |
2011-2012 | 19 | Construction of Community hall at ward no.167, Sri Rama Bhajana Mandali, 24th cross, 6th Block, Jayanagar, Bangalore. | 10 | work completed | EE, PRED, Bangalore | 10 | 0 |
2011-2012 | 20 | Construction of Sabha Bhavan at District Commandent office, home guards Bangalore District west of chord road, Rajajinagar | 15 | Completed | Project Manager, Nirmithi Kendra Urban | 15 | 0 |
2011-2012 | 21 | Construction of Shahaji Bhavan at Sri Amba Bhavani Seva Sangha, No.5 Bhavaninagar, Gavipuram, Kempegowda nagar, Basavanagudi Bangalore. | 15 | work completed | EE, PRED, Bangalore | 15 | 0 |
2011-2012 | 22 | Improvement works at Masti Ranga Mandira Shankarapuram, Bangalore | 10 | work under progress | Project Manager, Nirmithi Kendra Urban | 0 | 10 |
2011-2012 | 23 | Construction of First floor & Auditorium Renovation & Providing parking facilities of Bangalore gayana samaja, Sri Krishnarajendra road, Bangalore-04 | 25 | work under progress | Project Manager, Nirmithi Kendra Urban | 0 | 25 |
2011-2012 | 24 | Construction of Vishwa Bhavikya Mandira at Sri. Ramakrishna Seva Trust, Vivekananda Gutte. Sri matha sharada road, Opp to veerabhadra swamy Temple Girinagar, B’lore | 20 | Call for Estimate | Project Manager, Nirmithi Kendra Urban | 0 | 20 |
2011-2012 | 25 | Nature and place of work for laying of Eurecon tiles at kuvempu ranga mandira at ward no.158, Deepanjali nagar, avalahalli, B’lore | 10 | Completed | EE, PRED, Bangalore | 10 | 0 |
2011-2012 | 26 | Nature and place of work construction of baze bo & providing of pathway for park adjescent to kuvempu ranga mandira at ward no.158, Deepanjali nagar, avalahalli, B’lore | 10 | Completed | EE, PRED, Bangalore | 10 | 0 |
2011-2012 | 27 | Construction of class rooms at mahila seva samaja no.80 krishna rajendra road, basavanagudi, B’lore | 10 | Completed | Project Manager, Nirmithi Kendra Urban | 10 | 0 |
2011-2012 | 28 | Construction of computer laboratary building at mahila seva samaja no.80, krishna rajendra road, basavanagudi B’lore | 15 | Completed | Project Manager, Nirmithi Kendra Urban | 15 | 0 |
2011-2012 | 29 | Construction of Bayalu ranga mandira at marchahalli play ground, jp nagar, ward no.177 | 20 | Call for Estimate | EE, PRED, Bangalore | 0 | 20 |
2011-2012 | 30 | Construction of 2nd floor building at govt primary school, marthahalli, pattaberam nagar, ward no.168 | 25 | Completed | BBMP Bangalore. | 25 | 0 |
2011-2012 | 31 | Construction new rooms at Sri prasanna Anjaneya swamy trust at 13th cross, savakki gate main road, jp nagar, 1st phase B’lore 560078 | 10 | Completed | EE, PRED, Bangalore | 10 | 0 |
2011-2012 | 32 | Additional amount towards construction of Samudhaya Bhavan at sri Anjaneya Kshathriya maratha Trust, No.30, 1st main road, parvathipuram, B’lore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2011-2012 | 33 | Construction of Community hall at Srivarasiddi vinayaka seva trust, 3rd main ranganathapura, kaveripura ward no. 103, kamakshipalya B’lore | 10 | Completed | EE, PRED, Bangalore | 10 | 0 |
2011-2012 | 34 | Construction of school building at sri rajarajeshwari vidya samsthe trust. Garve bavipalya Beguru hobli | 25 | Completed | EE, PRED, Bangalore | 25 | 0 |
2011-2012 | 35 | Construction of Samudaya Bhavan at No.7, 7th main, BTM, (EWS) layout bangalore | 10 | work completed | Project Manager, Nirmithi Kendra Urban | 10 | 0 |
2011-2012 | 36 | Nature and place of work Additional amount towards the construction of library Building for television cultural & sports club ® at C.A. Site no.08, Bharath HBCS Sy no.17 & 18 uttarahalli layout Bangalore | 15 | work completed | Project Manager, Nirmithi Kendra Urban | 15 | 0 |
2011-2012 | 37 | Erection of Borewells & Energisation at kempapura Agrahara ward no.122, Magadi road, 9th cross | 3 | work completed | EE, PRED, Bangalore | 3 | 0 |
2011-2012 | 38 | Erection of Borewells & Energisation at kempapura Agrahara ward no.122, Magadi road, 8th cross, karuna looms corner. | 3 | work under progress | EE, PRED, Bangalore | 0 | 3 |
2011-2012 | 39 | Erection of Borewells & Energisation at Attiguppe ward no.132, 4th cross, Subbana garden | 3 | work under progress | EE, PRED, Bangalore | 0 | 3 |
2011-2012 | 40 | Construction of Educational centre for the poor & under privileged children at aird education centre, no.17, katriguppa main road, BSK 2nd Stage (Near vidyapeeta circle) Bangalore | 25 | Completed | EE, PRED, Bangalore | 25 | 0 |
2011-2012 | 41 | Procurement of One 2D color Dopplir Echo machine at Sri jayadeva Institute of Eardiovas enlar sci and research, Banurgatta Road, 9th Block, Jayanagar, Bangalore. | 25 | Completed | Director, SW Jayadeva Institute of Cordioscolar science & research, Bangalore. | 25 | 0 |
2011-2012 | 42 | Construction of Toilet Blocks & Renovation of Kichen at BASV (Nagarth) Samithi Sri Nagareshwaraswamy Temple premises nagarth pet | 10 | work under progress | Project Manager, Nirmithi Kendra Urban | 5 | 5 |
2011-2012 | 43 | Additional amount towards construction of Hostel at kumbara sangha, No.B, Kalasipalya, new extenstion, B’lore | 15 | Completed | Project Manager, Nirmithi Kendra Urban | 15 | 0 |
2011-2012 | 44 | Additional amount, towards the development of Byrasandra park inside the T.B.Sanitorium Hospital compound, Jaya nagar, Bangalore | 6.9 | work completed | Project Manager, Nirmithi Kendra Urban | 6.9 | 0 |
2011-2012 | 45 | construction of two class rooms at govt. pre university collage, Byatarayanapura, Mysore road, Bangalore | 10 | Completed | Project Manager, Nirmithi Kendra Urban | 10 | 0 |
2011-2012 | 46 | Construction of Toilet Block at govt. primary & High school, Byatarayanapura Mysore road, Bangalore | 15 | Completed | Project Manager, Nirmithi Kendra Urban | 15 | 0 |
2011-2012 | 47 | Construction of Maternity Hospital on first floor of general hospital, at kanaka nagar slum, maruthi mandira ward no.126, Govindaraja nagar constituency Bangalore | 25 | Completed | Project Manager, Nirmithi Kendra Urban | 25 | 0 |
TOTAL | 564.5 | 459.5 | 105 | ||||
2010-2011 | 1 | Erection of Borewell & Energisation at ward no.119, 3rd cross, opp to urdu high school, cubbonpet, bangalore. | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2010-2011 | 2 | Erection of Borewell & Energisation at sunkal pet main road, opp to Renukayellamma Temple, cubbonpet, bangalore. | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2010-2011 | 3 | Erection of Borewell & Energisation at opp to Annaiahppa garadi main road, Tigalarampet bangalore | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2010-2011 | 4 | Erection of Borewell & Energisation at opp to Dharmaraya swamy Temple Tigalarapet bangalore | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2010-2011 | 5 | Erection of Borewell & Energisation at Kalasipalya new Extention, bangalore | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2010-2011 | 6 | Construction of 4 class rooms vishvachethana trust kannada medium high school & P U College CA site no. 1 GKW Layout Sy. No.179/3 kempapura Agrahara Bangalore | 15 | work under progress | EE, PRED, Bangalore | 15 | |
2010-2011 | 7 | construction of Samudhaya Bhavan 2nd Phase at ward No.177 marenahalli village, JP Nagar, bangalore. | 20 | work completed | EE, PRED, Bangalore | 20 | 0 |
2010-2011 | 8 | Conversion of hall into 3 class rooms government first grade college, vijaya nagar, bangalore. | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2010-2011 | 9 | Construction 1st stage building Sneha Seva trust ® No.65, Shree Bande Anjaneya Swamy Temple, New Timberyard layout, Mysore road, Bangalore | 8 | call for estimate | EE, PRED, Bangalore | 8 | |
2010-2011 | 10 | Additional amount towrds the construction of 1st & 2nd floor & expending activities for senior citizens & Womens at presently existing library building at J P Nagar. 1st phase welfare association No.14, R R Layout JP Nagar, Bangalore | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2010-2011 | 11 | Developmental work at Dr.B R Ambedkar Stadium ward no.106, Basaveshwara nagar | 12.25 | call for estimate | EE, PRED, Bangalore | 12.25 | |
2010-2011 | 12 | Construction of community hall at sri.puttalamma Temple Timberyard layout | 10 | work completed | EE, PRED, Bangalore | 10 | 0 |
2010-2011 | 13 | Construction of community hall at madivala machideva Temple, kempanbudi lake, kempe gowda nagar, bangalore. | 10.25 | work completed | Project Manager, Nirmithi Kendra Urban | 10.25 | 0 |
2010-2011 | 14 | Construction of Library Building at karnataka yuvaka sanga, 2nd main, nagasandra, Thyagarajanagar, Bangalore | 10 | work completed | Project Manager, Nirmithi Kendra Urban | 10 | 0 |
2010-2011 | 15 | BBMP Health Centre, Wilson Garden, 9th Cross, Bangalore -27 | 10 | work completed | BBMP Bangalore. | 10 | 0 |
2010-2011 | 16 | BBMP Health Centre, Vijaynagar 5th main, MCA Layout, Bangalore | 10 | work completed | BBMP Bangalore. | 10 | 0 |
2010-2011 | 17 | BBMP Health Centre, Jayanagar 9th main, 2nd block, Bangalore | 10 | work completed | BBMP Bangalore. | 10 | 0 |
2010-2011 | 18 | BBMP Health Centre, BTM Layout, 12th cross, 2nd stage, Bangalore-76 | 5 | work completed | BBMP Bangalore. | 5 | 0 |
2010-2011 | 19 | BBMP Health Centre, V V Puram, Pobbathi Sajjan Rao circle, Bangalore | 10 | work completed | BBMP Bangalore. | 10 | 0 |
2010-2011 | 20 | BBMP Health Centre, Basavanagudi N R Colony, Subbaramashetty Road, Bangalore | 10 | work completed | BBMP Bangalore. | 10 | 0 |
2010-2011 | 21 | BBMP Health Centre, 27th cross, 17th main, Banashankari 2nd stage, Bangalore | 10 | work completed | BBMP Bangalore. | 10 | 0 |
2010-2011 | 22 | BBMP Health Centre, I P P 8, K S Layout, infront of police station, Bangalore | 5 | work completed | BBMP Bangalore. | 5 | 0 |
2010-2011 | 23 | Modirmisation of Three park at 28th main 4th T Block, between 34th and 35th cross jayanagar for Rotary bangalore. | 10 | work completed | Project Manager, Nirmithi Kendra Urban | 10 | 0 |
2010-2011 | 24 | BBMP Health Centre, Adugodi, Koramangala Road, Bangalore | 5 | Completed | BBMP Bangalore. | 5 | 0 |
2010-2011 | 25 | BBMP Health Centre, Yarab Nagar, 9th main, Banashankari 2nd stage, Bangalore | 5 | Completed | BBMP Bangalore. | 5 | 0 |
TOTAL | 195.5 | 160.25 | 35.25 | ||||
2009-2010 | 1 | Erection of Borewell & Emergisation at 3rd cross, Priyadarshini layout, Nagavashavi main road, moodalapalya, vijayanagar, B’lore | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 2 | Erection of Borewell & Emergisationa at Egipura ward BTM Layout Constituency 1) 27th Main 4th Cross, VGS Layout Egipura | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 3 | 11th Cross Sundari Memorial School, Egipura | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 4 | Indiragandhi Slum, Egipura | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 5 | 7th Cross, Srinigalu, Kaverappa Ground | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 6 | Erection of Borewell & Emergisation at BTM ward, BTM layout constituency Sri Rajarajeshwari samudaya Bhavan, BTM layout. | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 7 | Erection of Borewell & Emergisation at Jakkasandra ward BTM Layout Constituency 1) Pathalappa Garden | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 8 | Nanjanppa Layout No.2 | 5 | work completed | EE, PRED, Bangalore | 5 | 0 |
2009-2010 | 9 | Erection of Borewell & Emergisation at lakkasandra ward, BTM layout constituency Chandrappa nagar slum | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 10 | Erection of Borewell & Emergisation at lakkasandra ward, BTM layout constituency dairy quarters | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 11 | Erection of Borewell & Emergisation at lakkasandra ward, BTM layout constituency Mahalingeshwara Badavane | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 12 | Erection of Borewell & Emergisation at lakkasandra ward, BTM layout constituency Chikkalashmaiah layout | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 13 | Venkatapura nagar Venkateshwara temple | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 14 | Venkatapura apposite to srisagar hotel | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 15 | KSRP Quarters (PWD Block) | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 16 | Jakkasandra 4th Cross | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 17 | Theaching Colony | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 18 | HSR Layout 5th Sector | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 19 | Erection of Borewell & Energisation at Kote Sri.Prasanna Anjaneyaswamy temple, koteSri.jalakanteshwara Temple | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 20 | Construction of Shelter for the devotees at Gavigangadhara eshwara swamy pallakki uthsava samithi, Gavipuram | 5 | Completed | Project Manager, Nirmithi Kendra Urban | 5 | 0 |
2009-2010 | 21 | For the construction of 1st & 2nd fllor expanding activities for senior citizens womens at presently existing liabrary building at J P Nagar 1st Phase welfare association, V R layout | 5 | Completed | EE, PRED, Bangalore | 5 | 0 |
2009-2010 | 22 | Construction of community hall at jadadguru si madwacharya maha samsthanm, No.1/1 mallikarjuna Temple street. | 10 | work completed | Project Manager, Nirmithi Kendra Urban | 10 | 0 |
2009-2010 | 23 | for the development of Rangasourabha Auditorium at BHS Higher Education Society, 4th block jayanagar | 10 | work completed | Project Manager, Nirmithi Kendra Urban | 10 | 0 |
2009-2010 | 24 | Construction of community hall at Eshwara Swamy Temple at 1st Block east. Adjacent to newly inaugrarated byrasandra Bus Stand Jayanagar Bangalore. | 5 | work completed | Project Manager, Nirmithi Kendra Urban | 5 | 0 |
2009-2010 | 25 | Redrilling of Borewell providing PUMPSET, submersible cable, meter & Pend board & Erection Electrification commissionning of the same & construction of RCC hume pipe water ciestern. At govindaraj swamy & poojamma Temple. | 1.83 | work completed | EE, PRED, Bangalore | 1.83 | 0 |
2009-2010 | 26 | Redrilling of Borewell providing PUMPSET, submersible cable, meter & Pend board & Erection Electrification commissionning of the same & construction of RCC hume pipe water ciestern. At shaneshwara temple corporation colony, govindarajanagara constituency | 2.04 | work completed | EE, PRED, Bangalore | 2.04 | 0 |
2009-2010 | 27 | Construction of RCC hume pipe water ciestern at 3rd cross, priyadarshini layout, Nagarabhavi main Road, Moodalapalya Vijayanagar, Bangalore South. | 0.75 | work completed | EE, PRED, Bangalore | 0.75 | 0 |
2009-2010 | 28 | Constrction of Hostel Building for frue residenstial school at samarthanam Trust CA 39, 15th cross 16th Main sector 4, H S R layout Bangalore-34, stage-1 | 14 | work completed | Project Manager, Nirmithi Kendra Urban | 14 | 0 |
2009-2010 | 29 | Construction of water tanks for Borewell at 1. Jakkasandra ward, BTM Layout 2. Opposite Swsagar Hotel Venkatapura 3. Opp. KSRP Quarters 4. 4th Cross, Jakkasandra 5.Treachers Colony 6. HSR Layout, 5th Division 7. 27th Main, 4th Cross, VGS Layout, Egipura 8. 11th Cross Sundani manitoris School, Egipura 9. Indiragandhi slum Egipura 10. 7th Cross, Shinivagilu, kamrappa Compound 11. Potatappa garden lakkasandra 12. Nanjappa layout Div-02, lakkasandra 13. Nanjappa layout Div-02, lakkasandra 14. chandrappa nagar slum lakkasandra 15. pairy lakkasandra ward 16. Mahalingeshwara layout lakkasandra 17 Chikkalakshmaiah layout lakkasandra |
8.5 | work completed | EE, PRED, Bangalore | 8.5 | 0 |
2009-2010 | 30 | Construction of Library Building for television enltual and sports club (R) at C.A site No.8, Bharath HBCS Sy no.17 & 18 hattahalli layout Bangalore. | 10 | work completed | Project Manager, Nirmithi Kendra Urban | 10 | 0 |
2009-2010 | 31 | Construction of roof top for suchitra pray Auditorium of Suchitrakala kundra, No.36, B.V.kamath road, 9th main, BSK, 5 II Stage, Bangalore-560070 | 10 | work under progress | Project Manager, Nirmithi Kendra Urban | 10 | |
2009-2010 | 32 | Erection of Borewell & Energisation at ward no. 126 nanjeshappa layout, maruthi mandira, Bangalore | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 33 | Erection of Borewell & Energisation at subbanna garden, 1st main road, Bangalore | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 34 | Erection of Borewell & Energisation at ward no. 126 nanjeshappa layout, maruthi mandira, Anubdara nagar, 5th ‘A’ cross, church road, Bangalore | 2.5 | work completed | EE, PRED, Bangalore | 2.5 | 0 |
2009-2010 | 35 | Construction of 3 class rooms for sri. Gurushanthandana swamy high school No 323, Sri Siddarooda Ashrama, Mysore road, Bangalore-19 | 10 | work completed | EE, PRED, Bangalore | 10 | 0 |
2009-2010 | 36 | construction of Samudhaya Bhavan at Anjaneya kshathriya maratha trust, No.30, 1st main road, parvathipuram, Bangalore. | 10 | work completed | EE, PRED, Bangalore | 10 | 0 |
2009-2010 | 37 | Construction of library Building & Medical center at 1st floor, District Commondant office, Home Guards Bangalore District west of chora road, Rajaji nagar, Bangalore | 10 | Completed | Project Manager, Nirmithi Kendra Urban | 10 | 0 |
2009-2010 | 38 | 1st stage Construction of class rooms government primary school, shankarapura, Bangalore04 | 8 | work completed | Project Manager, Nirmithi Kendra Urban | 8 | 0 |
2009-2010 | 39 | 2nd stage Construction of class rooms government primary school, shankarapura, Bangalore-04 | 8 | work completed | Project Manager, Nirmithi Kendra Urban | 8 | 0 |
2009-2010 | 40 | Construction of Yoga kendra Building at Sri sampata narasimha swamy sri subramanya matha Basavanagudi Bangalore. | 15 | work completed | Project Manager, Nirmithi Kendra Urban | 15 | 0 |
Total | 200.62 | 190.62 | 10 |
Related Articles
As all these projects are pertaining to Bangalore South, citizens of that area will be more knowledged about these.
In general, as I go through the list, I find that no where the sanctioned amount has NEITHER fallen SHORT, NOR got EXCESS. That shows that accounts are being manipulated for presentation sake. The life of the projects are not mentioned so as to ascertain the quality. The brand of material is not mentioned to calculate the costs.
Hence this data is just for an EYE WASH and NOT a realistic SCENE.