BDA steel flyover Detailed Project Report, traffic simulation

Owing to public pressure, Bengaluru Development Authority (BDA) has uploaded more details on the steel flyover, including the Detailed Project Report (DPR) of the BDA’s proposed steel flyover from Chalukya Circle to Hebbalon Bellary Road late on Friday night (October 14, 2016). The same information was earlier denied when Namma Bengaluru Foundation had applied for it under RTI.

3D animation for the proposed project:

2D simulation video for the proposed project:

Link to the video: https://www.youtube.com/embed/Caq0Swx_46M

Here is the copy of the Detailed Project Report.

[embeddoc url=”https://images-citizenmatters.sgp1.digitaloceanspaces.com/wp-content/uploads/sites/14/2016/10/29151359/BDA-Detailed-Project-Report.pdf” download=”all”]

More clarifications on the project

[embeddoc url=”https://images-citizenmatters.sgp1.digitaloceanspaces.com/wp-content/uploads/sites/14/2016/10/29151359/Update-on-the-Elevated-Road.pdf” download=”all”]

List of trees to be cut in BDA steel flyover project

[embeddoc url=”https://images-citizenmatters.sgp1.digitaloceanspaces.com/wp-content/uploads/sites/14/2016/10/29151358/List-of-Plantation-Trees.pdf” download=”all”]

Integration plan at Hebbal Junction

[embeddoc url=”https://images-citizenmatters.sgp1.digitaloceanspaces.com/wp-content/uploads/sites/14/2016/10/29151358/INTEGRATION-PLAN-17-10-2016.pdf” download=”all”]

Source: http://bdabangalore.org/ElevatedRoad.html

Related Articles

BDA keeps steel flyover on hold after drawing flak from citizens
Steel flyover debate: Let a plan drive the city transport
Open letter to BBPAG members on steel flyover
BDA steel flyover tender documents
BDA botches up the steel flyover issue by hiding information

Support Citizen Matters - independent, Reader-funded media that covers your city like no other.DONATE
About News Desk 1215 Articles
The News Desk at Citizen Matters puts out Press Releases, notifications and curated information useful to the urban reader.