In this Bengaluru slum, 6500 people use 10 toilets at dawn

Amid the continuing saga on never-to-see new housing for people at the Ejipura slum, nearly 6500 people are now suffering due to a water supply outage. The slum is adjacent to Koramangala 8th Block in Bengaluru.

Slumdwellers here have been facing acute water shortage for the past three months. The two bore wells in the slum are sufficient to satisfy the water needs of the people. But the motor which pumps water stopped working and this broke water supply.

“We have to travel three kilometers daily for getting water from Austin town. We take bath only once in a week due to the water shortage. Some time we may not get water that force us to buy water for higher prices,” said Habeeb A S, a local resident.

Ejipura slum, wairting for new housing since 2004. Pic: Sankar C G.

Defecation is a nightmare for the people in the slum as most of the toilets in the slum are not fit for use. Out of the 50 toilets in the slum, only less than ten are in use due to lack of water.

“We have to be in queue for hours to defecate. 6,500 people are using less than ten toilets so there will be mess in the morning. We have complained to the corporation but were of no use,” says Louis X, 41,  President of B R Ambedkar Youth Social Welfare Association.

“The people living in the slum are completely aware of the hygienic measures but they don’t have proper resources. Most of the people living in the slum are suffering from skin diseases, allergic disorders and other kind of diseases. The entire problem existing in the slum has a deep root connection with the acute water scarcity”, says Nandhana Ramadurai, 25, a PhD student doing research work on the health of slum people.

Waste collection has also stopped and this is making matters worse. Slum association spoke to BBMP garbage workers and realised that cleaning activities were stopped due to non payment.

However BBMP Superintendent Engineer Govinda Raj defended it and said, “We are giving sufficient payment to all the cleaning staffs. If the contractor has not paid we are not responsible for that. We will take a look at the problems over the slum and will take necessary action very soon.”

Quarters quagmire

There are around 1500 houses in the Ejipura slum. These people have been living here from more than thirty years. As it is a declared slum, BBMP was supposed to provide aid for the welfare of this slum. But by citing shortage of funds, BBMP in 2004 invited tenders from private parties for constructing houses (Economically Weak Section quarters or EWS) for the residents here.  Maverick Holdings and Akrithi Nirman Ltd battled for acquiring the tender in court. The seven year long saga finally ended up with the High Court ordering the tender to Maverick on 21st Nov 2011.

When Citizen Matters asked about the construction of quarters for slum dwellers, BBMP’s Raj says, “We have already signed an agreement with Maverick Holdings. If they failed to start works shortly, we will take necessary action against them.”

Meanwhile, the residents of Ejipura slum are forced to live in unhygienic conditions without getting sufficient water for their daily needs.

RELATED
RELATED

Related Articles

Roofless, for a verdict they wait
A weekend at Ambedkar Nagar slum

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Similar Story

Mumbai Buzz: Heat wave hits Mumbai, BMC starts removing decorative lights from trees… and more

Other news in Mumbai: Fake mark sheets sold online; Barfiwala flyover and Gokhale bridge to be connected; Former Mayor gets anticipatory bail

Heat wave in Mumbai Mumbaikars experienced the hottest day in April in the past decade on Tuesday with the temperatures crossing a scorching 39.7 degree Celsius. According to the Indian Meteorological Department's (IMD) Santacruz observatory, Monday night was also the hottest night of the year in Mumbai. An orange 'severe heatwave' alert was sounded by the IMD for Tuesday. Tuesday's temperature showed an abnormal increase of 6.5 degrees above normal. Night temperatures on Monday also left Mumbaikars sweating with temperatures settling above 27 degrees at Colaba and Santacruz. The heatwave warning was extended to Wednesday with a yellow heatwave alert…

Similar Story

Bengaluru Buzz: Water supply upgrade | KIA gets global awards… and more

Other news of the week: BWSSB may get water from pumping stations, drive to ease traffic congestion and police dispose of 918 abandoned vehicles.

Water supply upgrade Even as the city completes 140 dry days with little rainfall, due to the El Nino effect, the India Meteorological Department (IMD) expects light to moderate showers this month. On April 19th, there were moderate rains. At 37.2 degrees Celsius, April 2nd was the fourth highest temperature for the month recorded in the last 15 years. On March 17th, the Bangalore Water Supply and Sewerage Board (BWSSB) agreed to supply Cauvery water to 21 IT parks in and around Mahadevapura, the BWSSB Chairman said after a meeting with members of the Outer Ring Road Companies Association (ORRCA).…