Articles by Manjunath Athrey

The wait is almost over – after years of staring at the ramps of the Whitefield-Kadugodi railway bridge that went nowhere, we are happy to report that the first piece of steel girder over the rail lines was put in place at 1.30 am on March 26th, 2010. The sandblasted and painted steel girder section installed across the ramps, above the electrical lines. Pic: Satinder Randhawa. The work of placing the steel girder over the Whitefield Railway overbridge started just past midnight after the electric lines were disconnected from mains over most of the tracks. Two tracks on the Sai…

Read more